The UBC Applied Sciences Digital Design Studio project is currently under construction. It will be situated in the service yard of the existing Chemical and Biological Engineering (CHBE) Building. This rendering shows a view of the North Elevation in the Service Yard. https://twitter.com/shapearch_/statu...07661419417715
Height limits in the other proposed UEL developments
Wesbrook Place: up to 39 storeys (117 metres)
Future Stadium Neighbourhood: up to 28 storeys (84 metres)
Future Acadia Neighbourhood: up to 35 storeys (105 metres)