HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jun 21, 2024, 3:53 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888



Src: article mentioned

In actual Surrey Langley Skytrain news, DailyHive has a new article detailing new information from the province:

New design renderings of the eight stations on Surrey-Langley SkyTrain
Kenneth Chan| Jun 20 2024, 5:20 pm
https://dailyhive.com/vancouver/surrey-langley-skytrain-station-designs-renderings-concepts

Summary:
- BC Gov releases new more detailed station renderings of the 8 stations on 16km line
- Each station has a staircase, elevator and both up and down escalators
- Seven with side platforms, end of line Langley City Centre has center platform
- Seven stations have secure bike space and retail before the fare gates (not enough room at Green Timbers station)
- 152nd station has pedestrian overpass across 152nd
- "Three stations — Bakerview-166 Street, Willowbrook, and Langley City Centre - will include major bus exchanges, with the bus exchange for Langley City Centre being the largest."
- "Major construction work on the Surrey-Langley SkyTrain extension will begin later in 2024 for completion and opening in late 2028" Supposedly.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.