
Src: article mentioned
In actual Surrey Langley Skytrain news, DailyHive has a new article detailing new information from the province:
New design renderings of the eight stations on Surrey-Langley SkyTrain
Kenneth Chan| Jun 20 2024, 5:20 pm
https://dailyhive.com/vancouver/surrey-langley-skytrain-station-designs-renderings-concepts
Summary:
- BC Gov releases new more detailed station renderings of the 8 stations on 16km line
- Each station has a staircase, elevator and both up and down escalators
- Seven with side platforms, end of line Langley City Centre has center platform
- Seven stations have secure bike space and retail before the fare gates (not enough room at Green Timbers station)
- 152nd station has pedestrian overpass across 152nd
- "Three stations — Bakerview-166 Street, Willowbrook, and Langley City Centre - will include major bus exchanges, with the bus exchange for Langley City Centre being the largest."
- "Major construction work on the Surrey-Langley SkyTrain extension will
begin later in 2024 for completion and opening in late 2028" Supposedly.