HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #1041  
Old Posted May 27, 2024, 7:58 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
A few photos of KRESA from a recent group tour (not my own). You can begin to picture how the central commons will come together -




Source: LinkedIn | George Kacan




Source: LinkedIn | CSM Group
Reply With Quote
     
     
  #1042  
Old Posted Jun 3, 2024, 1:35 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
Kalamazoo -

Inkster Street Bridge progress. While maybe not as unique as it's timber-framed predecessor, it still looks good and will be much more efficient -




Source: Facebook | City of Kalamazoo
Reply With Quote
     
     
  #1043  
Old Posted Jun 3, 2024, 4:46 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
Well, this is mildly interesting. The vacant Hallmark Living building at 3625 W Michigan Ave. might finally be demolished to make way for a 3-story, 223-unit apartment complex. The submitted site plan review documents don't afford much detail architecturally. The entire existing nursing home complex (built in the 1960s) would be demolished, and it looks like the new building would feature a center courtyard with a pool. I assume this will be targeted for students attending adjacent Western Michigan University. The project is simply titled "Kalamazoo Multifamily" and the client is listed as Kalamazoo Realty Holdings, LLC. The architect info appears intentionally left out in the title blocks on the floor plans.










Source: City of Kalamazoo
Reply With Quote
     
     
  #1044  
Old Posted Jun 18, 2024, 7:37 PM
DetroitMan DetroitMan is offline
Detroiter4life
 
Join Date: Jul 2001
Location: Back home in Georgia!
Posts: 4,114
Two new developments will be coming to Kalamazoo. The first is a new 4-story hotel in the Milwood neighborhood and the second is a 228-unit, income-based apartment complex that will overlook the Kalamazoo River.

Former Kalamazoo restaurant, gas station, could be transformed into 4-story hotel

Quote:
The city of Kalamazoo wants to help a developer build a four-story hotel in the Milwood neighborhood, just south of I-94.

But before anything can be built at 5135 and 5147 Portage Road, asbestos contamination from Brewster’s restaurant and a former gas station that was on site need to be cleaned up.

Brewster’s closed at the Portage Road location in March 2023, leaving the building vacant. Finding a committed developer for the site has been a challenge due to the added cost of environmental cleanup, said Kalamazoo Sustainable Development Coordinator Jamie McCarthy. That’s why the city is offering financial incentives to companies interested in developing there.

The city sees the project -- cleaning up the site and building a Residence Inn by Marriott there -- as an opportunity to spur economic development in the area and support nearby regional employers like Stryker and the Kalamazoo International Airport, McCarthy said.

The Kalamazoo City Commission approved a brownfield redevelopment plan for the property that will make the $18 million project financially possible, during its Monday, June 17 meeting.
https://www.mlive.com/news/kalamazoo...ory-hotel.html


New apartments on Kalamazoo River will offer 228 income-based units


Quote:
The River’s Edge apartment complex proposed by River Caddis Development is planned for 508 Harrison Street and 660 Gull Road, overlooking the Kalamazoo River near Verburg Park. The complex will have a mix of residential and retail space, with studio, single and two-bedroom units.The commission approved a payment in lieu of taxes (PILOT) agreement for the $43.5 million project during its Monday, June 17 meeting. This allows developers to approach the Michigan State Housing Development Authority for financing, said Kalamazoo Community Development Manager Sharilyn Parsons.

The commission also approved a $420,000 loan from the 2024 Housing Development Fund budget for the development. This funding will close the “gap” between financing from the state, PILOT money and county housing millage money compared to the construction costs, per city documents.

Under the PILOT, River Caddis will pay the city 5% of the revenue generated by rent each year for 45 years, instead of paying normal property taxes. While this reduces the state and local tax burden on developers by $455,353 per year, it’s estimated the city would only lose $97,635 per year, according to city documents.
https://www.mlive.com/news/kalamazoo...sed-units.html
Reply With Quote
     
     
  #1045  
Old Posted Jun 20, 2024, 1:58 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
The River's Edge development seems to have been trapped in development limbo for at least 4 years. It will be a mixture of relief & surprise, if / when dirt actually starts moving. Good to see that the unit count has not substantially changed (in fact, it has gone up a bit since 2020). Currently, the vacant site is home to a small encampment of unhoused persons.

As for the proposed Residence Inn, it's pretty "meh" news. But... an income-generating hotel is better than an empty restaurant. The only other immediate hotel options adjacent to the airport currently are the Hampton Inn and the Days Inn (which recently suffered a partial fire).

In other news, I saw this article yesterday, with some info about the design for the new Woodland Elementary, in Portage. Paywalled, but you get the picture -

Also, the City of Kalamazoo has more than $100 million-worth of funding going right now for roadwork projects (and trying to drive around town, it shows). WMUK did a story about it recently -

Quote:
Why is there so much construction in Kalamazoo?
Melissa Dancy | WMUK
June 18, 2024
Lastly, here's some great, recent drone shots of downtown Kalamazoo, taken by Bill Dolak -






Source: Facebook | Bill Dolak
Reply With Quote
     
     
  #1046  
Old Posted Jun 21, 2024, 2:03 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
The event center site. They are beginning to tear up the roads for utility work. These four blocks will start to look very different, very soon. Kalamazoo Ave. utility / roadwork on the left -


Source: Facebook | Bill Dolak
Reply With Quote
     
     
  #1047  
Old Posted Jun 23, 2024, 1:47 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
On the heels of news about a proposed new Residence Inn near I-94, news now that the existing Residence Inn at the corner of Portage and Kilgore Rds. will reportedly be converted into permanent housing. I have some nostalgia for the older, "cottage-style" hotels with multiple detached buildings, but it is a fading concept. The new hotel will have a much more generic tone. But it is a logical conversion proposal for 80+ units of badly needed housing -

Quote:
83-room hotel will be converted into apartments in Kalamazoo
Brad Devereaux | MLive
June 21, 2024
Reply With Quote
     
     
  #1048  
Old Posted Jul 8, 2024, 5:41 PM
BrewInKzoo BrewInKzoo is offline
Registered User
 
Join Date: Dec 2020
Posts: 16
A full remodel of Burdick's is in the works:

https://www.kalamazoocity.org/files/...ns20240628.pdf

Includes a duckpin bowling alley and a massively expanded outdoor seating area along Michigan ave
Reply With Quote
     
     
  #1049  
Old Posted Jul 11, 2024, 11:14 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
We dined at Old Burdick's a few months ago and it really needs a refresh. Hopefully this goes well. In studying the plans, I noticed that they will also expand into the gift shop, replacing it with a bar area open to the main lobby (a likely no-brainer for generating more income).

There is a growing trend of new food establishments in Kalamazoo, especially along the downtown Michigan Ave. corridor. In addition to this, Barrio, High Dive, and Crafted Copper have all recently moved downtown, or will open soon. We are in for several more years of downtown infrastructure upgrades (at least), but maybe these are some early fruits of the city's labors to reshape downtown?

This article seems timely, and gets right at that topic:

Reply With Quote
     
     
  #1050  
Old Posted Jul 12, 2024, 4:09 AM
Velvet_Highground Velvet_Highground is offline
Doc Love 3.0
 
Join Date: Mar 2022
Location: Metropolitan Detroit
Posts: 414
Nice shots of downtown dig one aligned with pedestrian mall. The corner shot is cool too the new apartments help add height and mass that makes the most of and bring together the more significant structures of K-Zoo.

It’s good to see the event center moving forward it’ll help what’s been an underutilized section of downtown grow moving forward.
__________________
Sixto Rodriguez - Cold Fact - Crucify your Mind
https://m.youtube.com/watch?v=KhMxmubp-5Q

Gil Scott Heron - We almost lost Detroit - 1966 Fermi 1
https://m.youtube.com/watch?v=cpNUqNe0U5g
Reply With Quote
     
     
  #1051  
Old Posted Jul 13, 2024, 4:50 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
Quote:
Originally Posted by Velvet_Highground View Post
Nice shots of downtown dig one aligned with pedestrian mall. The corner shot is cool too the new apartments help add height and mass that makes the most of and bring together the more significant structures of K-Zoo.

It’s good to see the event center moving forward it’ll help what’s been an underutilized section of downtown grow moving forward.
Bill definitely has a keen eye for architecture and urban design!

I think a lot of the potential success of the event center will depend on how well-designed (& implemented) it's connections to downtown & the northside are (for all modes of transit - car, bike, foot, bus, etc.) - at this stage, I'm cautiously optimistic that what is coming will be far better than what was there (which was effectively nothing).

Parts of downtown, especially around this site, are completely trashed with construction cones and road barriers - I think there will be a collective sigh of relief when this project, along with the 2-way road conversions, are finally complete.
Reply With Quote
     
     
  #1052  
Old Posted Jul 13, 2024, 4:56 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
Battle Creek -

Check out the progress on the new Double Tree by Hilton hotel -







Looks like an upper-level lounge / bar / event space?




Source: LinkedIn | Jessica Daly
Reply With Quote
     
     
  #1053  
Old Posted Jul 17, 2024, 2:56 AM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,573
I took a long drive on Sunday to check out various construction progress around Kalamazoo and Portage. Presented here in the order I came across them, starting with Kalamazoo (photos are greatly compressed, for ease of uploading) -

At WMU, the new parking deck and pedestrian bridge are taking shape -







Lot 89 is all torn up. Not sure if this is just for repaving project, or if there is something bigger in the works -



Demolition has begun on both the Bernhard Center (old student union building) and Valley 3 dormitories -





Moving downtown, all that remains of these three homes on Allen Blvd. that were destroyed by fire last month -



And right behind here, all that remains of Michikal Ave. -



And near all of this, all that remains of Eleanor St, and Water St., and Cooley St., and Park St. etc. etc. (sensing a theme?)...









...as they push hard with infrastructure work for the future event center, the inner streets have been vacated and mostly demolished -







Much of the downtown construction these days is heavily concentrated in the developing Arcadia West area. One thing I thought they were long done with was the new courthouse, but I noticed that they are now installing finished column wraps over the structural columns. Interesting, because I've heard more than one person comment that they seem too skinny and disproportionate with the scale of the building. It turns out, they just weren't finished with them! No doubt a supply-chain delay -



But enough about buildings. Back to roads! Ransom St. is also all torn up, causing distress for many local small businesses -







Depending on who you talk to, you'd think that streets are becoming an endangered species downtown -



ISK (the older building, not the new one) is getting an ADA ramp and new stairs -



Tiny Houses of HOPE (I love the concept, but I still think the location, at the SE corner of Westnedge & North St., is terrible, and much better suited to some denser mixed-use) -





The new, temporary location for the Alma Powell Branch Library (but honestly, it might make sense that this ends up becoming the permanent home, with some remodeling & site improvement work... we'll see) -



There's really not a lot to see from the street, but the Arcadia Lofts conversion is definitely underway -



Further south, 530 S Rose (Google satellite view is fairly new and already shows the building dwarfing the houses around it) -





Heading to the east side now, 1601 E Main (not the most flattering angle, but it was just a quick drive-by) -



Consumers Concrete's sexy new concrete masonry block factory, made out of (you guessed it!) concrete masonry block (corner of Sprinkle & E Michigan Ave) -





KRESA Career Tech Center, which I'm hoping to tour soon, to get some better photos -







The new, dual-branded Hilton Hotel (Tru by Hilton & Home2 Suites by Hilton), at 5185 E Cork St. -



For the prophecies sayeth, where once there grew corn, now there shalt be a great gathering of generic-boxy hotels, as far as thine eye can see, and it shall be good...

On to Portage, just a few things to share. First, Pfizer's MAP facility -





Second, the new Portage Central Elementary, one of several currently being built around the city -



Last, a look at Tall Timbers -






Last edited by deja vu; Jul 19, 2024 at 1:31 PM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 3:55 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.