Quote:
Originally Posted by new kid in town
It would be amazing if they start this project almost immediately after completing the Three Sisters. I won't even be surprised if this starts before St. Bernard and/or Infinity.
|
I have little doubt that this project will begin as soon as the tower crane is no longer needed for the Three Sisters (and as soon as possible after this land is no longer needed as a marshalling yard). Lafford has been approaching the Three Sisters as an assembly line. The "Two Brothers" is for all intents and purposes an extension of the Three Sisters project. This will be an assembly line too. If Lafford is aggressive, I could then see the tower crane then moving over to the nearby Tim Horton's site immediately afterwards (maybe 2027).
I predict excavation for the Two Brothers n early 2025, with the crane making an appearance by early fall 2025. If they could find some way to start excavation this fall, then the timeline could be accelerated.
- As for Infinity, I am resigned to the fact that construction won't begin before 2025.
- As for St. Bernard Place, I am hopeful we might see activity on site by the fall of this year (2024).
- Ashford/Downing is a mystery. They still need to complete necessary infrastructure first, and, since there will be municipal/provincial funding in the mix (city market, convention centre, possibly city library), this will further slow things down due to haggling over public monies and final design. I predict nothing before 2026, possibly 2027.