  #2721  
Old Posted May 25, 2024, 1:08 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,126
Quote:
Originally Posted by Metro-One View Post
Wow! Both the Broadway Subway and the Pattullo Bridge delayed… Good job BC!

Blah blah
This is the thread about the Broadway line construction. The article in the Hive lists some of the delays. The European based contractors have faced unexpected delays for various reasons, including materials shortages, and the complexity of trying to keep as much of Broadway operating while digging big holes underneath it.

None of the rest of your post has any relevance to this thread - and it's not as if you're even affected by the delay. How's that Japanese rail project going?
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #2722  
Old Posted May 25, 2024, 1:44 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,780
Quote:
Originally Posted by Changing City View Post
...the complexity of trying to keep as much of Broadway operating while digging big holes underneath it.
Because the project has kept Broadway open, the impact of the delay is a lot less than it would have been otherwise.
Reply With Quote
     
     
  #2723  
Old Posted May 25, 2024, 2:05 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,071
Well, that's the last time we hire Acciona for anything...
Reply With Quote
     
     
  #2724  
Old Posted May 25, 2024, 2:54 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
I wonder when they knew they were going to be this late.
Reply With Quote
     
     
  #2725  
Old Posted May 25, 2024, 4:27 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,126
Quote:
Originally Posted by Migrant_Coconut View Post
Well, that's the last time we hire Acciona for anything...
They were just announced as the preferred proponent to build the stations on the Surrey / Langley line. I don't know if that says anything about any blame for the delay on this project.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #2726  
Old Posted May 25, 2024, 6:42 AM
Vancouver_Highrise's Avatar
Vancouver_Highrise Vancouver_Highrise is offline
Registered User
 
Join Date: Dec 2008
Location: Vancouver
Posts: 321
Quote:
Originally Posted by jollyburger View Post
I wonder when they knew they were going to be this late.
A long time ago .. at least since November
Reply With Quote
     
     
  #2727  
Old Posted May 25, 2024, 6:46 AM
Vancouver_Highrise's Avatar
Vancouver_Highrise Vancouver_Highrise is offline
Registered User
 
Join Date: Dec 2008
Location: Vancouver
Posts: 321
Quote:
Originally Posted by BaddieB View Post
What exactly is going to take them over 3 years to do, considering the tunnels have already been bored? I only saw reasons why it was delayed but not exactly what's going to take them so long from here on out.
Can’t share the specifics
Reply With Quote
     
     
  #2728  
Old Posted May 25, 2024, 6:58 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,093
In October Daily Hive quoted the ministry saying it was delayed beyond Spring '26 and they would provide an updated date once tunneling is complete.
Reply With Quote
     
     
  #2729  
Old Posted May 25, 2024, 6:33 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,619
Quote:
Originally Posted by Changing City View Post
They were just announced as the preferred proponent to build the stations on the Surrey / Langley line. I don't know if that says anything about any blame for the delay on this project.
Aren’t they being sued for their work on the North Shore wastewater plant by MetroVancouver?
Reply With Quote
     
     
  #2730  
Old Posted May 25, 2024, 8:57 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,126
Quote:
Originally Posted by whatnext View Post
Aren’t they being sued for their work on the North Shore wastewater plant by MetroVancouver?
Technically, they're being counter-sued by Metro. Acciona initiated court action for nearly $300m after they were removed from the contract. They claimed Metro Vancouver had provided an unsuitable site and "conflicting and error-ridden" construction specifications.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #2731  
Old Posted May 25, 2024, 9:25 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,075
Quote:
Originally Posted by aberdeen5698 View Post
Because the project has kept Broadway open, the impact of the delay is a lot less than it would have been otherwise.
Maybe that was the reason for the delay...

Wonder if it is possible for a phased opening - to open VCC to Cambie first, and Cambie to Arbutus at the later date. From the DailyHive article, it have something to do with the vehicle desk on the western section of the project?

Many people only care about connect Millennium Line to Canada Line anyways...
Reply With Quote
     
     
  #2732  
Old Posted May 26, 2024, 2:21 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,780
Quote:
Originally Posted by nname View Post
Wonder if it is possible for a phased opening - to open VCC to Cambie first, and Cambie to Arbutus at the later date.
That would complicate the shakedown phase of the project and the integration of the new section(s) into the automatic train control system, neither of which are trivial undertakings.
Reply With Quote
     
     
  #2733  
Old Posted May 26, 2024, 8:55 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,075
Quote:
Originally Posted by aberdeen5698 View Post
That would complicate the shakedown phase of the project and the integration of the new section(s) into the automatic train control system, neither of which are trivial undertakings.
Well, Millennium was opened in phase as well, after a delay. I would argue that extending a line for 3 stations would not be more complicated then starting a complete new line for just 2 stations (Sapperton and Braid), and it would be much useful then the 2 stations stub that operated for about 8 months.

As far as I remember, Evergreen extension was operated with 3 different patterns before the opening. First breaking the Millennium Line with train terminate at Lougheed and Production, then extend the testing to Burquitlam, then extend again to Lafarge for the full test after the tunnel is fully completed. Although the Burquitlam wasn't opened early, but maybe it was an option they could consider if the tunnel delay was more than a few months.
Reply With Quote
     
     
  #2734  
Old Posted May 27, 2024, 4:15 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Maybe delay it to 2028 if Heidelberg Materials workers go on strike?

https://x.com/TeamstersStrike
Reply With Quote
     
     
  #2735  
Old Posted May 27, 2024, 4:30 PM
FarmerHaight's Avatar
FarmerHaight FarmerHaight is offline
Peddling to progress
 
Join Date: Jul 2019
Location: Vancouver's West End
Posts: 1,631
Quote:
Originally Posted by BaddieB View Post
What exactly is going to take them over 3 years to do, considering the tunnels have already been bored? I only saw reasons why it was delayed but not exactly what's going to take them so long from here on out.
The project's construction schedule is here.

It's all the other stuff that goes into building a subway. You know, laying track, building platforms, installing elevators and escalators, servicing the project with utilities, removing the traffic decks, closing all the holes, testing the trains, etc.

Perhaps if the TBM spoils conveyor belt didn't run through all the station excavations the project would be slightly further along, but I'm not sure how that could be avoided. Or perhaps if the project was cut-and-cover it would have been faster and we could have skipped the traffic decks, but that would have been extremely disruptive. Or perhaps if the project was elevated it would have been even faster, but that wasn't going to fly on the space-constrained Broadway corridor. Or perhaps if the project was an at-grade LRT it would have been even faster, but then the end result would not be nearly as transformative.
__________________
“Nothing compares to the simple pleasure of riding a bike” – John F Kennedy
Reply With Quote
     
     
  #2736  
Old Posted May 27, 2024, 4:47 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,583
Quote:
Originally Posted by Jimbo604 View Post
Over three years to finish a tunnel completed subway. Wow... simply wow.

Also no surprise they made this announcement on a Friday.
Yeah it's not even that long.

No way the Langley extension makes it's current timelines either.
Reply With Quote
     
     
  #2737  
Old Posted May 27, 2024, 4:59 PM
GenWhy? GenWhy? is online now
Registered User
 
Join Date: Jun 2017
Posts: 4,808
Quote:
Originally Posted by jollyburger View Post
Maybe delay it to 2028 if Heidelberg Materials workers go on strike?

https://x.com/TeamstersStrike
I've been hearing about this for months so I think we're past the "iffy" part. I don't have twitter so I dunno what that latest update is but I think we're fine for now.
Reply With Quote
     
     
  #2738  
Old Posted May 27, 2024, 5:10 PM
giallo's Avatar
giallo giallo is offline
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,697
Quote:
Originally Posted by FarmerHaight View Post
The project's construction schedule is here.

It's all the other stuff that goes into building a subway. You know, laying track, building platforms, installing elevators and escalators, servicing the project with utilities, removing the traffic decks, closing all the holes, testing the trains, etc.

Perhaps if the TBM spoils conveyor belt didn't run through all the station excavations the project would be slightly further along, but I'm not sure how that could be avoided. Or perhaps if the project was cut-and-cover it would have been faster and we could have skipped the traffic decks, but that would have been extremely disruptive. Or perhaps if the project was elevated it would have been even faster, but that wasn't going to fly on the space-constrained Broadway corridor. Or perhaps if the project was an at-grade LRT it would have been even faster, but then the end result would not be nearly as transformative.
I understand that this all takes time, but again, why wasn't this factored into its development in the first place? Translink has been building and extending Skytrain for decades now, so this isn't anyone's first rodeo. A two year delay is a pretty massive blow to a relatively short six station extension. I just don't understand how they got so far behind.
Reply With Quote
     
     
  #2739  
Old Posted May 27, 2024, 5:44 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,126
Quote:
Originally Posted by giallo View Post
I understand that this all takes time, but again, why wasn't this factored into its development in the first place? Translink has been building and extending Skytrain for decades now, so this isn't anyone's first rodeo. A two year delay is a pretty massive blow to a relatively short six station extension. I just don't understand how they got so far behind.
TransLink aren't involved with the development of the project. They take over once it's built. The Provincial Transportation Investment Corporation are managing the project, as they do for major investment projects. I think the contractors provide the initial estimate for how quickly the process will take, and they don't add much padding for anything unexpected (and it's a fixed price contract, so unless there's an agreed change to the project specifications, there's no wiggle room on the budget to speed things up. If it's a drop-dead 'must be completed on a specific date' project, then the bids will be a lot higher, or there's a risk of the contractor just walking off the project, which takes even longer and costs even more to reach completion).

With complex engineering projects it might be better to announce at the start of construction that the timeline is a best case scenario, and realistically it could take a couple of years longer. That's especially true for projects that rely on getting materials and specialist labour. We've seen significant delays in completion of residential towers where the developer's financial interests are in getting it finished, so the delays are widespread in construction at the moment. Unexpected episodes like the concrete strike add extra uncertainty, and things like that obviously can't be built into a project timeline.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #2740  
Old Posted May 27, 2024, 6:12 PM
giallo's Avatar
giallo giallo is offline
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,697
Quote:
Originally Posted by Changing City View Post
TransLink aren't involved with the development of the project. They take over once it's built. The Provincial Transportation Investment Corporation are managing the project, as they do for major investment projects. I think the contractors provide the initial estimate for how quickly the process will take, and they don't add much padding for anything unexpected (and it's a fixed price contract, so unless there's an agreed change to the project specifications, there's no wiggle room on the budget to speed things up. If it's a drop-dead 'must be completed on a specific date' project, then the bids will be a lot higher, or there's a risk of the contractor just walking off the project, which takes even longer and costs even more to reach completion).

With complex engineering projects it might be better to announce at the start of construction that the timeline is a best case scenario, and realistically it could take a couple of years longer. That's especially true for projects that rely on getting materials and specialist labour. We've seen significant delays in completion of residential towers where the developer's financial interests are in getting it finished, so the delays are widespread in construction at the moment. Unexpected episodes like the concrete strike add extra uncertainty, and things like that obviously can't be built into a project timeline.
Thanks for your response, CC. It sheds a bit more light on the variables.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:23 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.