Quote:
Originally Posted by BaddieB
What exactly is going to take them over 3 years to do, considering the tunnels have already been bored? I only saw reasons why it was delayed but not exactly what's going to take them so long from here on out.
|
The project's construction schedule is
here.
It's all the other stuff that goes into building a subway. You know, laying track, building platforms, installing elevators and escalators, servicing the project with utilities, removing the traffic decks, closing all the holes, testing the trains, etc.
Perhaps if the TBM spoils conveyor belt didn't run through all the station excavations the project would be slightly further along, but I'm not sure how that could be avoided. Or perhaps if the project was cut-and-cover it would have been faster and we could have skipped the traffic decks, but that would have been extremely disruptive. Or perhaps if the project was elevated it would have been even faster, but that wasn't going to fly on the space-constrained Broadway corridor. Or perhaps if the project was an at-grade LRT it would have been even faster, but then the end result would not be nearly as transformative.