Posted May 13, 2024, 4:40 PM
|
|
|
|
Join Date: Nov 2017
Posts: 22
|
|
|
Mount Seymour Parkway Safety Improvements
Quote:
We’re making changes along Mount Seymour Parkway — between Seymour Boulevard and Mount Seymour Road — to improve safety for people who bike, drive, and walk in this area.
With approximately 400 cyclists and an average of 20,000 vehicles passing through this stretch of road every day, we are working together with TransLink to improve safety for all users.
To do this, we’ll be lowering speeds and increasing separation between vehicles and cyclists, while maintaining existing travel lanes and parking for drivers.
The speed limit on Mount Seymour Parkway will be reduced to 50 km/h, which aligns with the speed limit on other arterial roads in our community.
About the work
This project is being delivered using TransLink’s Rapid Implementation approach to install improved cycling infrastructure quickly in a cost-effective way.
Safety upgrades will be installed without heavy construction and lengthy delays. Our goal is to be flexible with our installation approach, and allow for adjustments and changes as required, and in response to feedback from residents about safety.
A quicker installation also allows residents to experience the changes firsthand, then provide input that can help us better understand safety concerns and shape design adjustments as needed.
Project timing
Construction will begin in May 2024 and is anticipated to take approximately four months to complete.
|
Mount Seymour Parkway Safety Improvements
|