Quote:
Originally Posted by Migrant_Coconut
So then I suppose ... Robson, Davie ... should immediately get SkyTrains too
|
As a West Ender, yes please
All this talk about which major transit project should come first is a little silly, because all of the next five or 10 projects are all needed or justified
right now.
- Ironworkers is congested AF so we need the North Shore line.
- UBC is one of the most significant transit trip generators (maybe the most significant behind the downtown? I am not sure how to measure this, but I imagine the with the number of captive students riders plus all the employees it must be up there?) in the region and deserves Skytrain all the way.
- Metrotown and Oakridge are growing incredibly fast, and taking some congestion off the Metrotown to downtown segment of the Expo by enabling SoF residents to take transit to the airport and UBC without passing through downtown would be a god-send.
- Surrey is a major city in its own right, and if its ever going to slow its endless sprawl and develop in a more sustainable way the city could really use Scott Road, KGB, and 104 ave, like, rn.
- East Van is a traffic sewer every rush hour, and Hastings is incredibly walkable and surround by dense-ish neighbourhoods, so there should be a line there too.
- Lionsgate is also congested AF, and the West End would generate a ton of ridership, so there should totally be a First Narrows line.
- If we're going to maximize the SLS, a BRT or train connecting Langley City, Carvolth, Pitt Meadows, and Maple Ridge would by a big help.
The only reason why we are having this phasing conversation (and I say phasing because, as far as I understand it, no one is saying we should
never build 41/49, or UBCx, or the purple line, but rather which should come first) is because Metro Vancouver has only managed about one rapid transit project per decade since SkyTrain was introduced. And at that pace, the list I gave above, let alone the rest of the Translink2050 Major Transit Network, should all be completed and in-place by the mid-2100s.
After all my bloviating, the question is whether Metro Vancouver and its senior government funding and planning partners can manage two or *gasp* more rapid transit projects per decade from 2030 to 2050, similar to how the Broadway Subway and SLS should both be completed in the 2020s? At that pace (6+ major projects completed by 2050) there should be enough rapid transit to go around for Vancouver AND the North Shore AND SoF to all get their fair share (sorry Richmond et. al.).