Quote:
Originally Posted by TransitZilla
Ontario Line, which is a pretty big one.
|
The planning for that and even the budgeting had already started under the last government. They spent $150M on design starting in 2016. And even the TPAP started months before the election in 2018. Ford actually made that situation worse by stopping ongoing work, and then making a whole bunch of changes. If Ford wasn't elected, shovels would have been in the ground in 2020.
Quote:
Originally Posted by Hybrid247
Yes, this is true in Canada, not so much in the US. The average Ottawan may not understand it, but I think most on this sub do.
|
Given the complaints we're seeing here, I'm not sure people actually understand this. There's this constant appeal to proportionality. But transit demand is not proportional at all. And in Ottawa's case, given the workforce, even worse. Lower population growth only makes the investment case that much worse too.
Quote:
Originally Posted by Hybrid247
I agree in principle with your last sentence, but I'm not convinced that Hamilton needed a $3.4B LRT to achieve this, nor that the BCR for that project was nearly as high as the BCRs for Stages 1 and 2 in Ottawa.
I took a peak at the 2015 business case summary for the Hamilton project, and the projected 2031 AM peak load wasn't even 2000. A BRT would've easily served that demand at a fraction of the cost while still meeting the goal of adequately feeding the Lakeshore West GO line.
For comparison, the projected 2031 AM peak load at Moodie station alone is 4,226, while Algonquin is projected at 4,881. These projections would be admittedly lower if they were done post-covid, but the same goes for Hamilton.
|
Hamilton should have been a BRT. And I suspect if BEBs were more popular a few years ago that would have been more likely. In any event, Hamilton isn't up against Stage 1 and 2 in Ottawa. It's up against Stage 3. And on that front, my bet is that Hamilton would probably have a better BCR than Stage 3.
Quote:
Originally Posted by Hybrid247
The biggest benefits I can see is with these extensions is that they would save a lot of buses from having to make long trips across the greenbelt, thereby freeing them up for other trips, and they would eliminate an extra transfer for many riders, which may incentivize greater transit use. I'm not sure if those benefits would be enough to justify the costs, but I think it warrants consideration, especially given the low bar for Hamilton's project getting 100% funding from upper tiers of government.
|
The thing is, those extra kms are covered fairly quickly. This isn't even Scarborough where moving the terminus of the SSE to McCowan/Sheppard saves something like 10 mins for every bus from north Scarborough because of traffic patterns in the area. Moodie to Eagleson is less than 4km on high speed bus lanes. The LRT might save a minute. Ultimately saving 4 km per bus route for a dozen routes is just not going to be worthwhile. From Fallowfield to Baseline, takes 11 mins today and that's with a few stops. It's 7 km. Arguably a better case, especially with growth in Barrhaven and possible HFR plans. But even here, a rail extension might save 4-5 mins. Not sure that's enough.
As for bus savings, they are just not going to be enough. Let's use some ridiculous numbers to illustrate. Let's say a bus leaves every 5 mins from Barrhaven for Baseline. Let's say service runs 20 hrs per day. And let's say each km costs a dollar to operate.
12 buses/hr x 20 hrs/day x 14 km/bus x $1/km x 365 days/yr = $1 226 400
You could 10x the cost per km and account for a century of bus service and it still wouldn't save enough to pay for the extension to Fallowfield.