Today's Los Angeles Times has a great article about the planned high-speed rail line between Southern California and Las Vegas. It appears likely that this line will open before CAHSR and thus become the nation's first true high-speed railroad. They are aiming to have it open by the 2028 Olympics.
Reply With Quote
     
     
  #4042  
Old Posted Mar 3, 2024, 2:59 AM
Illithid Dude's Avatar
Illithid Dude Illithid Dude is offline
 
Join Date: Nov 2010
Posts: 3,234
Personally speaking I think these all look fantastic.
Reply With Quote
     
     
  #4043  
Old Posted Mar 13, 2024, 5:15 PM
38 Geary 38 Geary is online now
 
Join Date: Jan 2012
Posts: 11,902


Quote:
California bullet train project needs another $100 billion to complete route from San Francisco to Los Angeles
Updated: 7:43 AM PDT Mar 13, 2024
Ashley Zavala

SACRAMENTO, Calif. — As the state faces economic headwinds, California's mega high-speed rail project between San Francisco to Los Angeles also faces major funding hurdles, the project's CEO Brian Kelly told state lawmakers Tuesday.

Kelly testified in front of the State Senate's Transportation Committee on the High-Speed Rail Authority's updated draft business plan. In Tuesday's hearing, Kelly told lawmakers the project has $28 billion dollars on hand, but noted it was still a few billion dollars short to complete the Central Valley segment between Merced and Bakersfield. Depending on how long the segment takes to finish, it could cost between $32 Billion to $35 Billion. Kelly said the project is hoping to fill the gap with federal funds. That segment of the project is expected to be fully operational between 2030 and 2033, Kelly said.

Project leaders estimate it will still need an additional $100 billion to finish what voters were originally pitched in 2008: a bullet train that runs between San Francisco and Los Angeles. A timeline on its completion has not been set as the authority waits for environmental clearances for those segments.
https://www.kcra.com/article/california-...nding-san-francisco-los-angeles/60181448
Reply With Quote
     
     
  #4044  
Old Posted Mar 13, 2024, 6:16 PM
LAsam LAsam is offline
 
Join Date: Oct 2006
Posts: 2,952
And if they say $100B, it will probably end up higher than that.
Reply With Quote
     
     
  #4045  
Old Posted Mar 13, 2024, 6:32 PM
edale edale is offline
 
Join Date: Apr 2017
Posts: 2,816
What a mess and an embarrassment. So the estimate is now $135 billion for the whole project? And complete by when...2060? If this project was supposed to provide an example of the viability of HSR in the US, I'd say it's failing spectacularly. I highly doubt we'll ever see more than the CV line. $35 billion to connect f***ing Merced to Bakersfield...what a joke.
Reply With Quote
     
     
  #4046  
Old Posted Mar 14, 2024, 1:59 AM
craigs's Avatar
craigs craigs is offline
 
Join Date: May 2019
Posts: 11,092
Quote:
Originally Posted by edale View Post
What a mess and an embarrassment. So the estimate is now $135 billion for the whole project? And complete by when...2060? If this project was supposed to provide an example of the viability of HSR in the US, I'd say it's failing spectacularly. I highly doubt we'll ever see more than the CV line. $35 billion to connect f***ing Merced to Bakersfield...what a joke.
What state do you live in, again?

CAHSR will eventually run between the Bay Area and Southern California if Washington remains cooperative. That said, I don't expect service expansions to Sacramento and San Diego. In such a scenario, existing rail lines to those cities could be upgraded to faster rail, if not truly high-speed rail.

Meanwhile, the private Brightline high-speed railroad (publicly funded, of course) between Southern California and Las Vegas will be an example of the viability of HSR in the US. It will almost certainly be the first in the nation.
Reply With Quote
     
     
  #4047  
Old Posted Mar 14, 2024, 2:18 AM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
 
Join Date: Feb 2006
Posts: 13,247
Quote:
Originally Posted by craigs View Post
That said, I don't expect service expansions to Sacramento and San Diego. In such a scenario, existing rail lines to those cities could be upgraded to faster rail, if not truly high-speed rail.

We were going to have to wait a very long time for those anyway. That said, when they do happen I fully expect them to be fully compatible expansions of the then fully operational Phase 1.

Confidence is what is sorely lacking in this country.
Reply With Quote
     
     
  #4048  
Old Posted Mar 14, 2024, 11:38 AM
TowerDude TowerDude is offline
 
Join Date: Feb 2017
Posts: 386
Quote:
Originally Posted by craigs View Post
What state do you live in, again?

CAHSR will eventually run between the Bay Area and Southern California if Washington remains cooperative. That said, I don't expect service expansions to Sacramento and San Diego. In such a scenario, existing rail lines to those cities could be upgraded to faster rail, if not truly high-speed rail.

Meanwhile, the private Brightline high-speed railroad (publicly funded, of course) between Southern California and Las Vegas will be an example of the viability of HSR in the US. It will almost certainly be the first in the nation.
Amtrak should take over all Brightline operations.
Reply With Quote
     
     
  #4049  
Old Posted Mar 14, 2024, 2:19 PM
Nexis4Jersey's Avatar
Nexis4Jersey Nexis4Jersey is offline
 
Join Date: Mar 2009
Posts: 3,386
Quote:
Originally Posted by TowerDude View Post
Amtrak should take over all Brightline operations.
Given that they recived billions in loans and grants Amtrak should take over...but I feel like Amtrak would then be stuck with 2 terminals that preclude proper expansions. Las Vegas station should have been along the UP tracks in Downtown not the outskirts.. RC is an even bigger hurdle to connect to LAU.
Reply With Quote
     
     
  #4050  
Old Posted Mar 14, 2024, 2:51 PM
TowerDude TowerDude is offline
 
Join Date: Feb 2017
Posts: 386
Quote:
Originally Posted by Nexis4Jersey View Post
Given that they recived billions in loans and grants Amtrak should take over...but I feel like Amtrak would then be stuck with 2 terminals that preclude proper expansions. Las Vegas station should have been along the UP tracks in Downtown not the outskirts.. RC is an even bigger hurdle to connect to LAU.
From what I understand the Rancho station is just the phase 1 terminal for the Brightline Vegas route and the end game is for Brightline and CAHSR to collaboratively build the LA Union Station-Rancho leg of CAHSR and have Brightline trains run from Union Station. Or at least for some of Brightline's money being put towards the Union Station-Rancho leg of the route.
Reply With Quote
     
     
  #4051  
Old Posted Mar 14, 2024, 3:31 PM
Easy's Avatar
Easy Easy is offline
 
Join Date: Dec 2004
Posts: 1,598
Quote:
Originally Posted by Nexis4Jersey View Post
Given that they recived billions in loans and grants Amtrak should take over...but I feel like Amtrak would then be stuck with 2 terminals that preclude proper expansions. Las Vegas station should have been along the UP tracks in Downtown not the outskirts.. RC is an even bigger hurdle to connect to LAU.
If I’m understanding correctly, I don’t agree that the government* should operate the vehicles because it invested in the infrastructure. Too many examples where that doesn’t happen from airports to private vehicles. However it would make sense that there be competition to operate the equipment. It does seem unusual to make the infrastructure available to only a single private company.

I think that there’s a good chance that at least the part of CAHSR that connects LAUS to Rancho Cucamonga could happen if they’re able to start just that phase. They’ll likely have to take away freeway lanes or homes, or maybe both to do it.

*Amtrak isn’t technically a government company and would likely be a downgrade from Brightline.
Reply With Quote
     
     
  #4052  
Old Posted Mar 14, 2024, 3:43 PM
jmecklenborg jmecklenborg is offline
 
Join Date: Jul 2003
Posts: 4,306
The Brightline line as currently planned between "LA" and "Las Vegas" might technically be the nation's first HSR line, but it's going to be small-time by any global standard and as compared to CAHSR.

It's amazing how CAHSR's IOS ending many miles north of LA is a "failure" but Brightline gets a pass for the same transgression. Similarly, CAHSR won't be high speed or fully grade separated in its approach to San Francisco, but Brightline won't even attempt to reach DT Las Vegas.
Reply With Quote
     
     
  #4053  
Old Posted Mar 14, 2024, 6:00 PM
edale edale is offline
 
Join Date: Apr 2017
Posts: 2,816
Quote:
Originally Posted by jmecklenborg View Post
The Brightline line as currently planned between "LA" and "Las Vegas" might technically be the nation's first HSR line, but it's going to be small-time by any global standard and as compared to CAHSR.

It's amazing how CAHSR's IOS ending many miles north of LA is a "failure" but Brightline gets a pass for the same transgression. Similarly, CAHSR won't be high speed or fully grade separated in its approach to San Francisco, but Brightline won't even attempt to reach DT Las Vegas.
Brightline is proposed to stop right off the Vegas strip, so I don't know what you're talking about. On the other end, Brightline will be stopping in Rancho Cucamonga. While it's obviously not as good as it coming to DTLA (which I believe it eventually will) at least RC is in the metro area and is currently served by commuter rail. Bakersfield is nowhere close to Los Angeles, not in the metro area, and is not connected to LA by passenger rail at all. Pretty big difference!
Reply With Quote
     
     
  #4054  
Old Posted Mar 14, 2024, 6:09 PM
edale edale is offline
 
Join Date: Apr 2017
Posts: 2,816
Quote:
Originally Posted by craigs View Post
What state do you live in, again?

CAHSR will eventually run between the Bay Area and Southern California if Washington remains cooperative. That said, I don't expect service expansions to Sacramento and San Diego. In such a scenario, existing rail lines to those cities could be upgraded to faster rail, if not truly high-speed rail.

Meanwhile, the private Brightline high-speed railroad (publicly funded, of course) between Southern California and Las Vegas will be an example of the viability of HSR in the US. It will almost certainly be the first in the nation.
I live in California, and have been a big supporter of CAHSR since it was announced. I'm incredibly disheartened by the pace of construction, massive cost increases, and the horrible mismanagement of this project. The CAHSR CEO even said "I hope we have the wherewithal to do San Francisco to LA in 3 hours" after completing the initial segment. Hoping to get the project done, with $100+ billion more added, at this stage is really — to hear.

How about you? Any thoughts? What state do you live in?
Reply With Quote
     
     
  #4055  
Old Posted Mar 14, 2024, 7:10 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
 
Join Date: Feb 2006
Posts: 13,247
edale, I understand your frustration. The timeline and process has been aggravating and disappointing. It is very important to stay positive though and not get too down over this. The future could just as easily see an acceleration of progress and significant federal dollars that will enable the beginning of serious work beyond IOS. I do ask you please site that quote by Kelly... I find that very surprising he would say those exact words.
Reply With Quote
     
     
  #4056  
Old Posted Mar 14, 2024, 8:09 PM
numble numble is offline
 
Join Date: Sep 2006
Posts: 231
Quote:
Originally Posted by Busy Bee View Post
edale, I understand your frustration. The timeline and process has been aggravating and disappointing. It is very important to stay positive though and not get too down over this. The future could just as easily see an acceleration of progress and significant federal dollars that will enable the beginning of serious work beyond IOS. I do ask you please site that quote by Kelly... I find that very surprising he would say those exact words.
Here's the video and the transcript of the March 12 California Senate Transportation Committee Meeting:

https://www.senate.ca.gov/media/senate-transportation-committee-20240312/video
https://vod.senate.ca.gov/videos/2024/20240312_Transprtation.vtt

Quote:
01:28:49.257 --> 01:28:50.958
WE ARE IN A

01:28:51.025 --> 01:28:52.260
BETTER PATH TODAY ON IT THEN

01:28:52.326 --> 01:28:54.062
WHEN I STARTED AND I BELIEVE IT

01:28:54.128 --> 01:28:56.297
WILL GET DONE, AND THEN I HOPE

01:28:56.364 --> 01:28:57.632
WE HAVE THE WHEREWITHAL TO DO

01:28:57.699 --> 01:28:59.233
SAN FRANCISCO TO L A AND THREE

01:28:59.300 --> 01:29:00.201
HOURS BECAUSE THAT'S WHAT THIS

01:29:00.268 --> 01:29:02.136
PROJECT CAN DO, AND I THINK

01:29:02.203 --> 01:29:03.037
THAT'S REALLY IMPORTANT.
Reply With Quote
     
     
  #4057  
Old Posted Mar 14, 2024, 8:22 PM
edale edale is offline
 
Join Date: Apr 2017
Posts: 2,816
Quote:
Originally Posted by Busy Bee View Post
edale, I understand your frustration. The timeline and process has been aggravating and disappointing. It is very important to stay positive though and not get too down over this. The future could just as easily see an acceleration of progress and significant federal dollars that will enable the beginning of serious work beyond IOS. I do ask you please site that quote by Kelly... I find that very surprising he would say those exact words.
The quote is from the video included with this article: https://www.kcra.com/article/california-...nding-san-francisco-los-angeles/60181448

I am still supportive of the project and don't want it cancelled or anything, but I am very frustrated and I think several critical errors have been made so far that seriously jeopardize the likelihood that this project ever sees full completion in my lifetime.
Reply With Quote
     
     
  #4058  
Old Posted Mar 14, 2024, 8:27 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
 
Join Date: Feb 2006
Posts: 13,247
Hmm, he seems to be emphasizing the time aspect more than whether the actual SF-LA route will see completion. Which is odd since the Measure language has a legal requirement of 2:40 station to station which the entirety of all engineering and specifications for the entire program is based off of.
Reply With Quote
     
     
  #4059  
Old Posted Mar 14, 2024, 8:29 PM
TWAK's Avatar
TWAK TWAK is online now
 
Join Date: Feb 2004
Posts: 17,174
Quote:
Originally Posted by edale View Post
I live in California, and have been a big supporter of CAHSR since it was announced. I'm incredibly disheartened by the pace of construction, massive cost increases, and the horrible mismanagement of this project. The CAHSR CEO even said "I hope we have the wherewithal to do San Francisco to LA in 3 hours" after completing the initial segment. Hoping to get the project done, with $100+ billion more added, at this stage is really — to hear.
A lot of this has to do to the lawsuits that were intended to derail or stall the project, and it sure looks like it working in the minds of Californians. As long as construction is continuous, then it's ok and they have already started testing trains on the Caltrain part. Costs are going to rise with everything else and there's no way a contractor is gonna be paid in 2008 or 2018 money for something being built last year.

None of the mistakes have really been explained and a lot of it can be answered just by looking at the initial bond (like the speed complaints). I'd like to know about the mismanagement, specifically since it's an entire Authority.

Quote:
Originally Posted by Busy Bee View Post
Hmm, he seems to be emphasizing the time aspect more than whether the actual SF-LA route will see completion. Which is odd since the Measure language has a legal requirement of 2:40 station to station which the entirety of all engineering and specifications for the entire program is based off of.
Yup, and that includes the "not HSR!" travel time that was part of the OG proposition.
Reply With Quote
     
     
  #4060  
Old Posted Mar 14, 2024, 9:53 PM
jtown,man jtown,man is offline
 
Join Date: Dec 2003
Posts: 4,162
Who cares at this point.

The supporters would still support it if it were 10 trillion, they don't care.

Even though this money could have been used in a MASSIVE way to build bikeways and improve local transit throughout California.

But no, they are getting a massively overbudget rail line that competes with the airlines (aka most poor people won't use it).
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.