HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 4, 2024, 4:18 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,009
Quote:
Originally Posted by Coldrsx View Post
Reference ID: Job No 498731263-002
Description: To construct a Minor Utility building (LRT power supply) 10334 - 107 STREET NW (Utility Complex 11).
Location: 10340 - 107 STREET NW
Plan B2 Blk 7 Lots 123-126
Applicant: MARIGOLD INFRASTRUCTURE PARTNERS LP
Status: Intake Review
Create Date: 2024-01-23T11:51:18Z
Neighbourhood: DOWNTOWN
So there will be a utility building at 105 St and 102 Ave ANNNND 107 St and 103 ave?? Why so close? I will admit that I am not an engineer or designer of these highly complicated mass transit systems but I can't recall this many utility buildings so close together on the SE line.
__________________
"Call me sir, goddammit!"
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 1:12 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.