Quote:
Originally Posted by FarmerHaight
The extent of "all those delays" really depends on what part of Canada we're talking about.
If freight trains are trying to mix with GO traffic in the GTA, that wouldn't go well. There's a reason why GO owns the rails for most of its busiest routes.
Meanwhile between Mission and the Canadian Shield there are three passenger trains per week, per direction that mix on freight tracks. All of those trains could be given track priority, and the delays across CN's network would be miniscule.
Between Vancouver and Mission there are three trains per day, per direction on week days. Even if the WCE was upgraded to hourly service in each direction (which won't happen in the foreseeable future) I find it hard to believe the CPR couldn't schedule the four to six trains that arrive at East L Yard every day around that.
|
Well, we're talking about passenger trains mixing with freight on freight companies tracks in the Lower Mainland. The only way that passenger trains might be given any sort of priority would be if there was legislation that forced the freight business to do so. Even then it might not help. I was on the Cascades from Seattle last week - running late, as the Portland to Seattle section was a bus link, as mudslides washed out the tracks in Washington.
We should have been into Vancouver soon after 10.00, but the conductor warned us that there were freight trains ahead, so it would probably be 11.15. We reached Boundary Road at 11.05, so it was looking like he was about right. Then we sat for 3 hours, as a train ahead of us was being broken up and shunted into the sidings. The despatcher refused to speak to the Amtrak crew. Amtrak officials couldn't get a reply, or any help, from the Canadian freight operators. The train crew handed out free water and snacks. We eventually arrived at 2.15am. Fortunately CBSA were still fully staffed, and welcoming (despite also having to wait 3 hours), and there were still cabs outside willing to drive passengers for the price on the meter). The last Cascades I took was also delayed over two hours, in New Westminster, because a freight engine failed ahead, and had to be towed by another engine, (which they took over an hour to find).
Dedicated passenger tracks are the only way to guarantee on-time service, and the level of demand for passenger trains is far too small to justify that expense, (as a current priority) even if the space existed to provide those tracks (which isn't the case without some very expensive engineering).