HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #4021  
Old Posted Jan 2, 2024, 8:49 PM
FromSD FromSD is offline
 
Join Date: Aug 2021
Posts: 184
Quote:
Originally Posted by electricron View Post
True, costs will rise as this project gets delayed. The question we must ask is WHY it got delayed. They promised that further studies were not needed, that further designs were not needed, and that further taxes were not needed. They lied on all three promises. 25% of the eco taxes was added, more studies and more designs are continuously being done, and 14 years later, are still being done.
Who promised that? How could further studies (including environmental) not have been needed when the detailed design had not even been started when the bond issue was on the ballot? And I'm assuming that detailed design had not started by 2008 because detailed design is expensive, and there was no money to pay for it before the bond issue passed.

If anything, work on HSR started too soon. One of the major hiccups in the process was that contractors got the go ahead to start work before all the land for the proposed route in the Central Valley had even been acquired. This was due in part to CA HSR having received money from the Obama stimulus and so there were time constraints--"shovel ready projects."

I think the most serious flaw of the CA HSR project was the original bond proposition itself. I didn't believe the cost estimates. I thought the deviation through the Antelope Valley didn't make sense. And I still don't think that HSR will be able to operate--as the bond proposition promised--without public subsidy. I didn't believe the claims that private investors would bankroll the major proportion of the remaining construction costs. That being said, steady progress is being made on the Central Valley segment month by month. Is it quick progress? No, because the state legislature releases money in dribs and drabs. In 2022, more money was being spent, and more labor was being expended, to widen the San Diego Freeway through North Orange County than was being spent on HSR. And Republicans always point to HSR as the state's biggest financial boondoggle, but that's not true because over the course of 15 years the state really hasn't devoted substantial resources to it.

As for the complaint that the no new taxes claim was untrue: in the context of the original proposition that is a true statement. The bond issue required no tax increases. The bond issue is to be repaid from the state's general revenues. California voters are quite willing to approve bond issues if no new taxes are required. They are happy to ignore that there is still a hit to the state budget when the bonds are repaid.
Reply With Quote
     
     
  #4022  
Old Posted Jan 3, 2024, 5:35 AM
jmecklenborg jmecklenborg is offline
 
Join Date: Jul 2003
Posts: 4,299
Quote:
Originally Posted by lrt's friend View Post
Do highway projects also escalate in cost? Or are they more immune since we are building highways all the time and have a better handle on costs.

Basic rural highways are pretty easy to predict, but we aren't building many all-new highways anymore. It's mostly incremental improvements, which means there isn't much land acquisition. Also, a rail transit project, by default, includes the costs of the trains themselves. Also signaling, training the staff, maintenance facilities, etc. When we estimate the cost of a highway, we don't include the cost of the cars, the gas stations that fuel them, the insurance of the cars, etc. The public highways do not pay property tax but for-profit railroads do.

The Big Dig, obviously, was very complex and had many significant overruns.
Reply With Quote
     
     
  #4023  
Old Posted Jan 3, 2024, 8:00 AM
Will O' Wisp Will O' Wisp is offline
 
Join Date: May 2018
Posts: 488
Quote:
Originally Posted by lrt's friend View Post
Do highway projects also escalate in cost? Or are they more immune since we are building highways all the time and have a better handle on costs.

The positive is that once rail projects are built, we have permanent new infrastructure. It is too bad that rail improvement had little investment between 1950 and 1990, but that was a product of highways being public and rail being private and the railways only saw investment in freight as beneficial to them, until Brightline anyways. At least now, we are finally realizing the benefit of public rail projects.
Highway projects do escalate in cost, but in general not as much as rail.

Here's a chart, sourced from The Cost-Benefit Fallacy, a sort of sequel to the seminal Megaprojects and Risk:



Benefit overrun is a comparison of first-year usage estimates vs actuals. For rail, this is predicted first-year ridership vs actual.

First-year benefits are not always the best metric, usage rates can rise significantly over time, but usage rates for subsequent years can often be difficult to source. You'll note even a first-year usage comparison can only be obtained for a minority of projects.

As you can see, rail projects have an average cost overrun of 40% and an average of 44% less ridership in the first year than predicted. Road projects by comparison stand at 24% and 4%, respectively.

There's no one reason for why this happens. Here are some factors I've seen:

-Your typical road project is smaller than your typical rail project. Road projects encompass everything from two lane non-subgraded country roads to miles long 8+ lane concrete viaducts, and there's a whole lot more of the former than the latter. Plus, you don't need to buy trainsets or wire up high voltage lines along a roadway, but typically do with a new railway. There's a less complexity with smaller projects, less potential unknown factors, so the estimates tend to be better.

-Road projects can be more flexible in their capacity than rail projects. Rail infrastructure has an extremely high base cost, so while a road project can switch between a 6 lane highway and a 4 lane greenway to match predicted usage, a passenger rail project typically requires double tracking. In short, there's a lot of ways to build a road, but only one or two to build a railway, and all of them tend to be on the bigger side. That sometimes leaves you with the only options being either overbuilding your new rail line, or not building it at all.

-Road projects are easier in the design and construction. Cars can travel up and down far higher grades than railed vehicles, and make much tighter turns. That means less earthmoving and digging (almost always the most lengthy part of any transportation project), and more flexibility on location. It's just easier with a road make a swerve and a sensitive area, rather than getting bogged down by public protests or lawsuits.

-Not to put too fine a point on it, but the benefits of rail projects to their supporters often fall outside of a cost/benefit ratio. Reduced greenhouse gas emissions, lower air pollution, better social equity, better city character, some of the biggest advantages of rail transit projects fall outside a simple measure of ridership vs cost. But that's a problem because public funding's availability usually is defined by this measure. That leaves a lot of incentive for political organizers to encourage, or at least look the other way when an consultant submits unrealistic estimates for cost or ridership.

On the last point, as you can see from the chart most major infrastructure projects use sweetheart statistics to some extent. There's just a little more incentive with rail, because without goosing those the cost vs ridership stats a bit you'd always see rail losing out in the funding game to roads. Which is pretty much what happened in the mid-20th century USA, back when those in power cared a lot less about intangible benefits and so saw little reason to give rail the leg up it often needs.

Last edited by Will O' Wisp; Jan 3, 2024 at 8:29 AM.
Reply With Quote
     
     
  #4024  
Old Posted Jan 3, 2024, 9:17 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
 
Join Date: Feb 2006
Posts: 13,244
A big dollop of horse — "reason" from Wendell Cox in the WSJ:

https://www.wsj.com/articles/bidens-3-1-...ifornia-high-speed-rail-project-6e7045a1
Reply With Quote
     
     
  #4025  
Old Posted Jan 3, 2024, 9:51 PM
electricron's Avatar
electricron electricron is offline
 
Join Date: Aug 2008
Posts: 3,616
Lightbulb

Quote:
Originally Posted by FromSD View Post
Who promised that? How could further studies (including environmental) not have been needed when the detailed design had not even been started when the bond issue was on the ballot? .
Per
https://web.archive.org/web/201304130346...008/general/argu-rebut/argu-rebutt1a.htm

Specifically
Proposition 1A will protect taxpayer interests.
Public oversight and detailed independent review of financing plans.
Matching private and federal funding to be identified BEFORE state bond funds are spent.
90% of the bond funds to be spent on system construction, not more studies, plans, and engineering activities.

Bond financing to be available to every part of the state.
The most cost-efficient construction segments to have the highest priority.

Falshood #1 No private matching funds found to date, yet bonds were sold and spent.
Falsehood #2 No more studies, plans, and engineering activities.
$8 Billion in State bonds, somehow it is hard to believe they have not spent more than $800 million on more studies, more plans, and more engineering activities.
Reply With Quote
     
     
  #4026  
Old Posted Jan 3, 2024, 11:41 PM
FromSD FromSD is offline
 
Join Date: Aug 2021
Posts: 184
Quote:
Originally Posted by electricron View Post
Per
https://web.archive.org/web/201304130346...008/general/argu-rebut/argu-rebutt1a.htm


90% of the bond funds to be spent on system construction, not more studies, plans, and engineering activities.[/U]
But that isn't a promise that no further design or preparation work would be required, just that the Prop 1A bond money would not be spent on those activities. CAHSR has other funding available to it (state cap and trade revenues, federal stimulus revenues), so it actually isn't clear to me that the 10% promise wasn't fulfilled.

But this is just a bookkeeping quibble. I wouldn't argue with your view that the original proposition was misleading. I do disagree with your implication that the project shouldn't have needed additional studies and design work, and that the months and years taken to perform those functions count as a ding against the project.

I do understand, though, why Prop. 1A promised almost all the bond funds for construction. Voters want to see their tax money going for concrete, rails and trains, ignoring all the other things that go into developing a rail system. Engineering is much less — than concrete.
Reply With Quote
     
     
  #4027  
Old Posted Jan 30, 2024, 5:12 PM
202_Cyclist's Avatar
202_Cyclist 202_Cyclist is offline
 
Join Date: Feb 2009
Posts: 6,450
Brightline West conducts fieldwork in California ahead of high-speed rail groundbreaking

By Rene Ray De La Cruz
Victorville Daily Press
Jan. 29, 2024

"Brightline West launched field investigation work this week in Southern California in anticipation of a groundbreaking of its high-speed rail system between Las Vegas and Rancho Cucamonga.

The fieldwork, for the proposed rail corridor within the Interstate 15 right-of-way, will advance the final stages of design in preparation for a groundbreaking, Brightline West told the Daily Press.

Field work also began earlier this month in Nevada for what Brightline West officials call “America’s first true high-speed rail system..."

https://www.vvdailypress.com/story/news/...nia-ahead-of-groundbreaking/72372501007/
Reply With Quote
     
     
  #4028  
Old Posted Jan 30, 2024, 8:57 PM
tech12's Avatar
tech12 tech12 is offline
 
Join Date: Sep 2005
Posts: 3,330
“America’s first true high-speed rail system..."

lol

Are people just going to keep pretending that CA HSR doesn't exist?
Reply With Quote
     
     
  #4029  
Old Posted Jan 30, 2024, 9:48 PM
LAsam LAsam is offline
 
Join Date: Oct 2006
Posts: 2,952
Quote:
Originally Posted by tech12 View Post
“America’s first true high-speed rail system..."

lol

Are people just going to keep pretending that CA HSR doesn't exist?
When is the first phase of CA HSR supposed to open? Perhaps Brightline West merely plan to commence operations sooner.
Reply With Quote
     
     
  #4030  
Old Posted Jan 30, 2024, 10:58 PM
SoCalKid SoCalKid is offline
 
Join Date: Jul 2012
Posts: 616
Quote:
Originally Posted by tech12 View Post
“America’s first true high-speed rail system..."

lol

Are people just going to keep pretending that CA HSR doesn't exist?
I think they mean it will be the first true high speed rail system to open/operate. That's likely to be true if they break ground in the next year or so.
Reply With Quote
     
     
  #4031  
Old Posted Jan 30, 2024, 11:21 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
 
Join Date: Feb 2006
Posts: 13,244
Obviously I'll take it, but to have our first true high speed rail line be one that hitches a ride in the median of a highway, is largely single tracked and pushes the limits of high speed rail tech and operations well outside international norms by purposefully avoiding arguably necessary earthworks and tunneling to save private capital is THE most American thing I've ever heard. And that's before you mention it's being built to funnel tourists to THE most vulgar den of vice and greed ever conjured by modern man.

Call me petty but I almost want there to be some delays that pushes Brightline's opening after the CHSR IOS.
Reply With Quote
     
     
  #4032  
Old Posted Feb 9, 2024, 1:47 AM
202_Cyclist's Avatar
202_Cyclist 202_Cyclist is offline
 
Join Date: Feb 2009
Posts: 6,450
The LA Times has a good article looking at the construction of California's high-speed rail, focusing on the changes and impacts in Fresno. It wasn't written by Ralph Vartabedian, so it isn't a hit piece against the project.

The Republicans in Congress would prefer that thousands of people be unemployed instead of creating good American jobs by investing in modern, efficient, transportation.

High-speed rail is coming to the Central Valley. Residents see a new life in the fast lane


By Melissa Gomez
LA Times
Feb. 8, 2024

"FRESNO, Calif. — The piling rig was in position, ready to drive a concrete pillar 40 feet into the ground. Just beyond the rig on this winter afternoon, trucks and cars continued streaming down State Road 198 in Hanford, separated from the construction site by white dividers.
Then, the pile-driving began. Foot by foot, the rig’s hammer slammed the pillar into the ground with the rhythmic beat of a metronome. With every blow, the ground shook and exhaust spewed. The beam would be one more in a network of pillars pounded deep into the earth to create the foundation for a high-speed rail line that in a matter of years will glide along tracks above the state highway, launching a new era in California’s Central Valley.

From earth-moving equipment to heavy trucks ferrying massive beams and bulldozers clearing piles of debris, construction related to California’s high-speed rail project is evident across the San Joaquin Valley. Farther north, crews worked atop a viaduct that will carry the high-speed line above existing freight tracks that cut across the state north to south. And in Fresno’s Chinatown, restaurant and retail owners eagerly served a steady influx of construction workers, engineers and electricians, part of a broader transformation of the city’s downtown and economic prospects..."

https://www.latimes.com/california/story...ia-high-speed-rail-construction-progress
Reply With Quote
     
     
  #4033  
Old Posted Mar 1, 2024, 6:58 PM
38 Geary 38 Geary is offline
 
Join Date: Jan 2012
Posts: 11,891
Quote:
CA High-Speed Rail Authority Reveals Plans For Central Valley Stations



BY: ANDREW NELSON 5:30 AM ON MARCH 1, 2024

California’s High-Speed Rail Authority has revealed detailed plans for four stations along the Central Valley segment. While High-Speed Rail remains a distant prospect for the Bay Area, construction on the 171-mile portion winding through the San Joaquin Valley shows steady progress. Previous statements by the Governor suggest that work connecting the Bay Area with the central line will not start until after the Central Valley tracks begin operating in the 2030s.

Foster + Partners and ARUP are responsible for the design and engineering. The canopy for all four locations is nearly identical, providing a recognizable architectural vernacular to be shared across the region. Beyond that, distinct treatment has been given for each of the concourses and main entrances. The Merced station is particularly noteworthy, where the grand stairwells will be bookmarked by large cobblestone walls capped by open wood roofing.



The four station plans shared include Merced, Fresno, Kings/Tulare, and Bakersfield. Each station will have an 80 to 90-foot-tall metal canopy covering the superstructures. Three stations will have raised platforms where riders board the trains, with Fresno as the outlier. Kings/Tulare and Bakersfield will have their entire station and concourse beneath the platform. In Merced, the station will be immediately next to 15th Street, while an elevated walkway over ACE and freight train tracks will connect to additional waiting space and bus depot functions along 16th Street.
https://sfyimby.com/2024/03/ca-high-spee...s-plans-for-central-valley-stations.html
Reply With Quote
     
     
  #4034  
Old Posted Mar 1, 2024, 7:03 PM
38 Geary 38 Geary is offline
 
Join Date: Jan 2012
Posts: 11,891
And the renderings from North to South:

Merced








Fresno








Kings/Tulare






Bakersfield








https://sfyimby.com/2024/03/ca-high-spee...s-plans-for-central-valley-stations.html
Reply With Quote
     
     
  #4035  
Old Posted Mar 1, 2024, 7:17 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
 
Join Date: Feb 2006
Posts: 13,244
Saw these yesterday when they were posted on YIMBY... A couple observations... I do like them but I'm leery of rustic elements like the stone being used in the architecture for this program. It looks a bit too much Yosemite lodge when a bullet train station should feel more sci-fi/ultramodern IMO. I'm not sold on that scaffold-style standalone signage on the roof, set in all caps or otherwise. I think station names on the reverse of a central wall of glass like you see quite a bit of in Europe would be more attractive. I'm also a bit skeptical of those massively tall flights of stairs. Even assuming the escalators are always working, there doesn't appear to be any refuge levels. It would be like ascending and descending an Aztec temple.
Reply With Quote
     
     
  #4036  
Old Posted Mar 1, 2024, 7:56 PM
LosAngelesSportsFan's Avatar
LosAngelesSportsFan LosAngelesSportsFan is offline
 
Join Date: Oct 2004
Posts: 7,904
Looks good to me! Im sure it will be refined before implementation but i like the direction
Reply With Quote
     
     
  #4037  
Old Posted Mar 1, 2024, 8:26 PM
38 Geary 38 Geary is offline
 
Join Date: Jan 2012
Posts: 11,891
The stairs do look pretty daunting.
Reply With Quote
     
     
  #4038  
Old Posted Mar 1, 2024, 9:20 PM
plinko's Avatar
plinko plinko is offline
 
Join Date: Jul 2001
Posts: 7,712
^It's a rendering guys. California Building Code requires a landing every 12 vertical feet.
Reply With Quote
     
     
  #4039  
Old Posted Mar 1, 2024, 9:40 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
 
Join Date: Feb 2006
Posts: 13,244
^Kinda seems like a rendering that has been released to the public after design services contracts have been awarded and design is no doubt above 0% should not be showing obvious elements that would never show up/be allowed in the final design.

My .02
Reply With Quote
     
     
  #4040  
Old Posted Mar 1, 2024, 11:24 PM
TWAK's Avatar
TWAK TWAK is offline
 
Join Date: Feb 2004
Posts: 17,174
from the article:

That's two regional connections for Merced station, not bad. Fresno's downtown station is on a different rail ROW and I think that's the same for Bakersfield.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
   
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:48 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.