Quote:
Originally Posted by plrh View Post
The riverbank stabilization is happening first. It is a separate contract from the lot servicing, however I heard that one contractor has both jobs. The stabilization must happen before the river thaws.
Thats super interesting. Do they have to shore it up because of all the extra weight those towers will add?
Reply With Quote
     
     