Quote:
Originally Posted by Mac Write
How about blocking off the platform that won't be used at each station? and if it is going to be single tracked for 2-years why not setup the single track and add platform extensions so all door boarding for both stations?
|
Both platforms will be used.
I'm guessing the Braid terminating trains will use the inbound platforms and the Production Way terminating trains will use the outbound platforms.
The video does say using either platform during peak periods. This probably means only the outbound platform will be used off peak, though off peak may mean after 9:30pm in this case.