Why these projects all seem to be having trouble is beyond me. Our housing costs are insane, there's literally ZERO risk to lending for housing construction in Austin. Period. None.
I hope all of these get built. Does anyone know when the Rundberg extension is going to happen? It was funded by the 2016 bond, in 2019 CAMPO pitched in money, and it is apparently still in the design phase with no anticipated start date. This ish is fully funded, is two blocks long, and we have spent EIGHT YEARS DESIGNING IT?!?!?!?! SMH. This is a copy pasta and make suitable arrangements for context job, not some revolutionary project where we have to reinvent the wheel.
https://data.austintexas.gov/stories/s/West-Rundberg-Lane/rtsu-m38y/