9th floor of city gardens poured today

Reply With Quote
     
     
  #482  
Old Posted Dec 13, 2023, 5:46 AM
VantageHD's Avatar
VantageHD VantageHD is offline
Registered User
 
Join Date: Feb 2016
Location: Kamloops
Posts: 749
I was on site today making a delivery and didn't get a chance to count because it was such a gong show with that pour. I was thinking it looked like they were on 9 - thanks for confirming. Seems like they're lucking out with the weather and doing a floor just over a week.
Reply With Quote
     
     
  #483  
Old Posted Dec 16, 2023, 5:44 PM
RHINO's Avatar
RHINO RHINO is offline
Project manger
 
Join Date: Feb 2007
Location: KAMLOOPS
Posts: 825
Welcome aboard mindcash !
__________________
Trudeau HAS dragged us all into ruin.
Reply With Quote
     
     
  #484  
Old Posted Dec 16, 2023, 6:45 PM
VantageHD's Avatar
VantageHD VantageHD is offline
Registered User
 
Join Date: Feb 2016
Location: Kamloops
Posts: 749
I was at Canary Lofts yesterday at 1st and Columbia and that building is now definitely under construction. There was no action there for awhile but excavation and demo of the existing building was happening.
Reply With Quote
     
     
  #485  
Old Posted Dec 17, 2023, 3:37 AM
mindcash mindcash is offline
Registered User
 
Join Date: Dec 2023
Posts: 123
Quote:
Originally Posted by VantageHD View Post
I was at Canary Lofts yesterday at 1st and Columbia and that building is now definitely under construction. There was no action there for awhile but excavation and demo of the existing building was happening.
As far as I'm aware, they are only renovating the existing building, and building additional ones that connect with it. Good to hear they're starting the construction though.

Last edited by mindcash; Dec 17, 2023 at 4:34 AM.
Reply With Quote
     
     
  #486  
Old Posted Dec 19, 2023, 8:38 PM
RHINO's Avatar
RHINO RHINO is offline
Project manger
 
Join Date: Feb 2007
Location: KAMLOOPS
Posts: 825
I had been very worried that that was going to be another Kamloops pipe dream.
__________________
Trudeau HAS dragged us all into ruin.
Reply With Quote
     
     
  #487  
Old Posted Dec 20, 2023, 1:13 AM
VantageHD's Avatar
VantageHD VantageHD is offline
Registered User
 
Join Date: Feb 2016
Location: Kamloops
Posts: 749
I was a little worried too. Glad its happening. I think it's going to turn out good. I'll take any development that isn't designed by Blue Green.
Reply With Quote
     
     
  #488  
Old Posted Dec 20, 2023, 4:33 PM
RHINO's Avatar
RHINO RHINO is offline
Project manger
 
Join Date: Feb 2007
Location: KAMLOOPS
Posts: 825
I thought you really liked Green Blue
__________________
Trudeau HAS dragged us all into ruin.
Reply With Quote
     
     
  #489  
Old Posted Dec 21, 2023, 1:43 AM
VantageHD's Avatar
VantageHD VantageHD is offline
Registered User
 
Join Date: Feb 2016
Location: Kamloops
Posts: 749
They're my nemesis
Reply With Quote
     
     
  #490  
Old Posted Dec 27, 2023, 2:34 AM
mindcash mindcash is offline
Registered User
 
Join Date: Dec 2023
Posts: 123
Merry Christmas!

Does anyone have an update for the new/existing construction (101 oak, thompson landing, 156 tranquille, etc.) builds on the North Shore?

Thanks.

Last edited by mindcash; Dec 27, 2023 at 3:35 AM.
Reply With Quote
     
     
  #491  
Old Posted Dec 31, 2023, 2:49 AM
Jensen201's Avatar
Jensen201 Jensen201 is offline
Registered User
 
Join Date: Dec 2023
Location: Tk’emlups
Posts: 84
Hey guys, I don’t know how to add images, but there seems to be talk about two 6storey residential buildings on North Shore called ‘the Pulse on Eighth’ they plan on taking over the country auto sales as well as the buildings around it.

https://www.facebook.com/ThePulseon8th?mibextid=LQQJ4d
Reply With Quote
     
     
  #492  
Old Posted Jan 1, 2024, 8:04 PM
VantageHD's Avatar
VantageHD VantageHD is offline
Registered User
 
Join Date: Feb 2016
Location: Kamloops
Posts: 749
Happy New Year!

Hey Jenson, I use flickr, but any photo hosting website should work. Just need to upload you photos to it and copy the link in your message. Took me a bit to figure out too. I went and did this project for you. I never heard of it but have driven past the rezoning sign and been wondering what they were looking to put there. According to the city they have both an application in for re-zone and development permit. The yellow outline shows where it will go on 8th St.



Reply With Quote
     
     
  #493  
Old Posted Jan 1, 2024, 8:31 PM
VantageHD's Avatar
VantageHD VantageHD is offline
Registered User
 
Join Date: Feb 2016
Location: Kamloops
Posts: 749
Mindcash, I took this one off my roof for you. you can see 4 projects, 3 of which are under construction.

501 Tranquille is almost complete.
The orange tarp on the left is 560 Tranquille. They poured the 1st floor just before xmas.
101 Oak has not started yet.
Above 101 Oak you can just see the 6 plex on Elm is under construction.
Don't have a picture of Thompson Landing, but did a delivery to it a couple weeks ago and they were already on the 2nd floor of the 1st building.

Curious if anyone else thinks 501 Tranquille is as bad as me. Obviously designed by Blue Green, this building is a mess imo. 4 different coloured panels, they didn't colour match the panel frames, so there's a bunch of lines that stand out. White trim windows, which is fine but then decided to add black railings. The ground floor they opted for black frames on the windows and threw in Lux wood panels, because why not. Hard to make Lux panels look bad but they somehow found a way. Blue Green always finds a way. It is a complete mess, I hate looking at it out my window every day haha.

Reply With Quote
     
     
  #494  
Old Posted Jan 2, 2024, 3:22 AM
mindcash mindcash is offline
Registered User
 
Join Date: Dec 2023
Posts: 123
Quote:
Originally Posted by VantageHD View Post
Mindcash, I took this one off my roof for you. you can see 4 projects, 3 of which are under construction.

501 Tranquille is almost complete.
The orange tarp on the left is 560 Tranquille. They poured the 1st floor just before xmas.
101 Oak has not started yet.
Above 101 Oak you can just see the 6 plex on Elm is under construction.
Don't have a picture of Thompson Landing, but did a delivery to it a couple weeks ago and they were already on the 2nd floor of the 1st building.

Curious if anyone else thinks 501 Tranquille is as bad as me. Obviously designed by Blue Green, this building is a mess imo. 4 different coloured panels, they didn't colour match the panel frames, so there's a bunch of lines that stand out. White trim windows, which is fine but then decided to add black railings. The ground floor they opted for black frames on the windows and threw in Lux wood panels, because why not. Hard to make Lux panels look bad but they somehow found a way. Blue Green always finds a way. It is a complete mess, I hate looking at it out my window every day haha.

Looking at the design renderings for 501 tranquilee, it really feels like they just threw together leftover materials from past projects and used them here lol
Reply With Quote
     
     
  #495  
Old Posted Jan 17, 2024, 10:40 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,091
Quote:
"BC Housing is currently assessing the damage and it’s not yet known how this might impact the timeline for completing renovations to the building," a BC Housing spokesperson said in an emailed statement to iNFOnews.ca.

BC Housing didn't say what day the flood occurred or where the pipe was.

The cold snap dropped temperatures to around -20 Celsius in Kamloops and the apartment building at 435 Cherry Avenue wasn't the only building in the city to have problems with frozen pipes.

The 42-unit apartment's flood isn't the first vacant BC Housing purchase to flood before it finishes renovations.

...

At 435 Cherry Avenue, the $13 million purchase hinged on the previous owner taking on certain renovations. The last owner didn't do the work, so BC Housing held back $250,000 on the purchase, attributing the initial delay to the uncompleted renovations.

https://infotel.ca/inhome/burst-pipe-flo...-apartment-building-in-kamloops/it102709
Holy crap they STILL have not finished that?? 501 might be butt-ugly but somehow they managed to build that faster than it's taken to remodel an existing apartment building.
Reply With Quote
     
     
  #496  
Old Posted Jan 18, 2024, 4:37 AM
VantageHD's Avatar
VantageHD VantageHD is offline
Registered User
 
Join Date: Feb 2016
Location: Kamloops
Posts: 749
Was at City Gardens today. They look to be on the 11th floor now.

Reply With Quote
     
     
  #497  
Old Posted Jan 18, 2024, 5:30 AM
Jensen201's Avatar
Jensen201 Jensen201 is offline
Registered User
 
Join Date: Dec 2023
Location: Tk’emlups
Posts: 84
So happy with the outcome so far with city gardens, they seem to be flying by with the completion of the floors fairly quickly, here is a picture I took Earlier this month when they were on the 9-10th? Floor! Thanks VantageHD for showing me how to upload a picture, I hope I did it right loll..

https://flic.kr/p/2pt5JPd

Last edited by Jensen201; Jan 18, 2024 at 5:51 AM.
Reply With Quote
     
     
  #498  
Old Posted Jan 18, 2024, 5:49 AM
mindcash mindcash is offline
Registered User
 
Join Date: Dec 2023
Posts: 123
Quote:
Originally Posted by VantageHD View Post
Was at City Gardens today. They look to be on the 11th floor now.

One floor away from being half way to full height. Hopefully the snow goes away soon so they can keep pouring floors!
Reply With Quote
     
     
  #499  
Old Posted Jan 18, 2024, 5:52 AM
Jensen201's Avatar
Jensen201 Jensen201 is offline
Registered User
 
Join Date: Dec 2023
Location: Tk’emlups
Posts: 84
Quote:
Originally Posted by mindcash View Post
One floor away from being half way to full height. Hopefully the snow goes away soon so they can keep pouring floors!
That’s so awkward it didn’t work again so I just posted URL
Reply With Quote
     
     
  #500  
Old Posted Jan 18, 2024, 5:40 PM
BC.Tom BC.Tom is offline
Registered User
 
Join Date: Nov 2023
Posts: 93
I guess the Country Auto buildings takes the number to 17 for project/buildings along the Tranquille Market Corridor.

https://www.castanetkamloops.net/news/Ka...r-Eighth-Street-in-North-Kamloops#467809

Thompson Landing x 2
Innova x 2
Red Sea Auto x 1
Jamaican Kitchen x 3
Brendan Shaw x 1
Duchess x 2
501 Tranquille Rd x 1
562 Tranquille Rd x 1
Co-op x 1
Interior Community Services x 1
Country Auto x 2

Sure would be nice to have a page like Develop Kelowna to keep it all straight: https://developkelowna.ca/projects/under-construction
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia
Forum Jump



Forum Jump


All times are GMT. The time now is 10:21 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.