Quote:
Originally Posted by adamuptownsj
Shrill cycling zealots are the squeakiest wheel. I've wondered before how they get all these stupid projects completed at taxpayer expense, which piss off drivers and businesses, without any kind of volume study. Hell you can't get a sidewalk built in the suburbs without years of waiting and 'proof' that people are walking on the shoulder in substantial numbers. There's so very few cycling commuters but they have more clout than drivers, pedestrians, and public transit users combined. Beyond my understanding.
But yeah, Moncton needs parking garages. Maybe the lot between Albert and Foundry? You could put a gigantic one here. Street level commercial along the Foundry side could be viable. Even build a giant 4-5 floor parking podium with residential above it, like the Three Sisters, but without the townhouse style lower units, could work: it's a perfect location for Main St, Avenir, and so on. You could build pretty close to the railroad tracks with concrete, if there's no residential on the lower floors, I believe. Maybe add a pedway over the rail too.
|
I would agree with all this. I'm all for finding ways to improve active transportation when it makes sense, but this needs to be done carefully.
Until there is adequate multi level parking garages downtown the street spaces are very important. We already had many naysayers who thought Avenir would be the downfall of the city and that people would be parking at the hospital and walking down or taking shuttles to events.
None of that happened of course, but the citizens have now adapted to the change we asked them to which is to find a street spot anywhere downtown and walk anywhere from 2-10 minutes to the arena. Its working well and it would be terrible to then suddenly start taking away all these spaces. We can't throw that goodwill away. Not to mention we have already seen the discussions around busses and that we dont expect to see any additional fleet added in the near term.
I'm personally surprised we've seen no movement on the lot owned by heritage. Years ago they wasted a bunch of money installing gates at both entrances of the lot, only to not use them in the end due to a disagreement with a commercial tenant. I dont foresee any scenario where this lot ever exceeds being 1/3 full. Would there be any restrictons building something here due to the traintracks?