Old Posted Dec 9, 2023, 4:21 AM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 2,416
Also dying for the hotel to get going
Reply With Quote
     
     
  #7502  
Old Posted Dec 11, 2023, 7:25 AM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,430
Quote:
Originally Posted by FactaNV View Post
I walk home from DT to West Broadway after work time to time and I've been enjoying the construction. I also find it very aesthetically pleasing on that block, quasi-futuristic looking. If only that hotel would be built.
2-3 years away but they are considering one 30 floor tower.
Mixed use.
Cuts operation costs than staffing 2 buildings
Reply With Quote
     
     
  #7503  
Old Posted Dec 11, 2023, 5:31 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,380
Quote:
Originally Posted by BAKGUY View Post
2-3 years away but they are considering one 30 floor tower.
Mixed use.
Cuts operation costs than staffing 2 buildings
Here's to hoping something gets done.
Reply With Quote
     
     
  #7504  
Old Posted Dec 11, 2023, 6:08 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
Quote:
Originally Posted by BAKGUY View Post
2-3 years away but they are considering one 30 floor tower.
Mixed use.
Cuts operation costs than staffing 2 buildings
Where did that info come from? Speculation on SSP doesnt count.
Reply With Quote
     
     
  #7505  
Old Posted Dec 11, 2023, 6:47 PM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,430
Quote:
Originally Posted by bomberjet View Post
Where did that info come from? Speculation on SSP doesnt count.
I have no clue what SSP is? Sweet & Sour Pork?
However, I read that on here several weeks ago.
Apparently they are looking into the supports built there and may have to redo it if they go the taller 1 building option.
Reply With Quote
     
     
  #7506  
Old Posted Dec 11, 2023, 7:37 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
SkyScraper Page. This website. The pork does sound delicious though.

I think we surmised they may go with one tower. But there are technical issues with that. Hoping something comes along..
Reply With Quote
     
     
  #7507  
Old Posted Dec 11, 2023, 7:52 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,284
Quote:
Originally Posted by bomberjet View Post
SkyScraper Page. This website. The pork does sound delicious though.

I think we surmised they may go with one tower. But there are technical issues with that. Hoping something comes along..
I'd be ecstatic if they went with the proposed design.

A 30 storey tower would be pretty cool though. I'd be surprised if the foundation could handle it though, normally don't design a foundation to accommodate a building that's 50% taller than proposed.
Reply With Quote
     
     
  #7508  
Old Posted Dec 11, 2023, 7:53 PM
drew's Avatar
drew drew is offline
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,930
Quote:
Originally Posted by BAKGUY View Post
2-3 years away but they are considering one 30 floor tower.
Mixed use.
Cuts operation costs than staffing 2 buildings
Anything is possible - however given the foundations are already in place for the original height and support locations for the 2-tower design - unless they vastly overbuilt the foundation (bordering on impossible) this is not an easy or cost-effective change to make.
Reply With Quote
     
     
  #7509  
Old Posted Dec 11, 2023, 8:26 PM
roccerfeller's Avatar
roccerfeller roccerfeller is offline
Registered User
 
Join Date: Jul 2010
Location: BC
Posts: 2,932
^ Whats the benefit in going in this direction at this point in time as opposed to the original idea?

seems like Sutton is just perpetually losing money and wasting valuable time
Reply With Quote
     
     
  #7510  
Old Posted Dec 11, 2023, 11:03 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,380
Quote:
Originally Posted by roccerfeller View Post
^ Whats the benefit in going in this direction at this point in time as opposed to the original idea?

seems like Sutton is just perpetually losing money and wasting valuable time
I'm shocked that TNSE has allowed this project to languish so long. This is a jewel in their tiara on that block and the hotel was supposed to be a 5 star used partly for NHL teams and acts coming to town. This has been in development hell for years.
Reply With Quote
     
     
  #7511  
Old Posted Dec 12, 2023, 12:03 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,606
Quote:
Originally Posted by FactaNV View Post
I'm shocked that TNSE has allowed this project to languish so long. This is a jewel in their tiara on that block and the hotel was supposed to be a 5 star used partly for NHL teams and acts coming to town. This has been in development hell for years.
True North has no oversight on this development, they sold the land to Northland Properties, it’s entirely Northland’s project.
Reply With Quote
     
     
  #7512  
Old Posted Dec 12, 2023, 1:10 AM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,380
Quote:
Originally Posted by Wpg_Guy View Post
True North has no oversight on this development, they sold the land to Northland Properties, it’s entirely Northland’s project.
Ah! I thought TNSE was involved!
Reply With Quote
     
     
  #7513  
Old Posted Dec 12, 2023, 4:51 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,284
Quote:
Originally Posted by FactaNV View Post
Ah! I thought TNSE was involved!
They really should be...
Reply With Quote
     
     
  #7514  
Old Posted Dec 12, 2023, 8:10 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,863
i cant believe they continue to pay to have 1 lane closed on St Mary since 2018. or maybe they dont pay?

Oct 2018
https://maps.app.goo.gl/H4oHNETisXdh4a4YA

july 2023
https://maps.app.goo.gl/oq4rwq3ZqLpetB9H6
Reply With Quote
     
     
  #7515  
Old Posted Dec 13, 2023, 2:39 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
They're paying. The cost just isnt that significant IIRC. Maybe someone knows rates.

Case in point the Donald St Mary development cleared off the street immmedeatly. I wonder if theyre paying for the sidewalk occupancy along the Donald side ( I will assume yes they are, as they should be).
Reply With Quote
     
     
  #7516  
Old Posted Dec 13, 2023, 3:40 AM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 947
Quote:
Originally Posted by bomberjet View Post
They're paying. The cost just isnt that significant IIRC. Maybe someone knows rates.

Case in point the Donald St Mary development cleared off the street immmedeatly. I wonder if theyre paying for the sidewalk occupancy along the Donald side ( I will assume yes they are, as they should be).
$16.90/square metre per month of street used. x 3.7m wide x ~40m long = ~$2500/month
Reply With Quote
     
     
  #7517  
Old Posted Dec 13, 2023, 4:02 AM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,380
Quote:
Originally Posted by plrh View Post
$16.90/square metre per month of street used. x 3.7m wide x ~40m long = ~$2500/month
— city. There should be a couple zeroes added to that for delays this long.
Reply With Quote
     
     
  #7518  
Old Posted Dec 13, 2023, 4:55 PM
rkspec rkspec is offline
Registered User
 
Join Date: Aug 2014
Posts: 775
Quote:
Originally Posted by zalf View Post
Progress on the skywalk to Wawanesa. Carlton Street is open again, although I was enjoying the quiet of the road closure.
Any updated pics?

Reply With Quote
     
     
  #7519  
Old Posted Dec 13, 2023, 6:49 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,284
No updated pics from myself, but I drove by there the other day, and it looks very slick, definitely matches the rest of the development!
Reply With Quote
     
     
  #7520  
Old Posted Dec 13, 2023, 7:00 PM
zalf zalf is offline
Registered User
 
Join Date: Jun 2020
Posts: 870
I'll do what I can, though it tends to be dark out by the time I get back there. Grump is better positioned for a daylight shot.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 10:29 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.