HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West


Reply

 
Thread Tools Display Modes
     
     
  #8941  
Old Posted Dec 1, 2023, 10:46 PM
ucsbgaucho ucsbgaucho is offline
Registered User
 
Join Date: Dec 2006
Posts: 366
Quote:
Originally Posted by Paniolo Man View Post
It is my interpretation that UPRR is playing hard to get as many concessions as possible. Salt Lake City is getting hard about trains blocking crossings, It's a PR hurt that UPRR can't seem to shake. Rio Grande plan trades curves for slight grades and the ability to stop trains for as long as they please.

They just want to make sure that they seem opposed since a hard stance will likely get them the best deal.
You're probably correct, and I'm sure if they don't have to pitch in any money, they will have to concede the process in general and allow it to happen. Interesting the difference in airlines vs railroads, Delta pours over $1 billion into the airport expansion while UPRR says no thanks to contributing anything. Obviously the airport expansion has a direct benefit financially to Delta, wouldn't the RGP have a financial benefit to UPRR as well?
Reply With Quote
     
     
  #8942  
Old Posted Dec 2, 2023, 1:49 AM
rockies's Avatar
rockies rockies is offline
Registered User
 
Join Date: Apr 2021
Location: Utah
Posts: 369
Are they paying for it? Aren't they getting free grade separated tracks with probably no disruption to current tracks during construction?

One of the most beautiful things about the RGP is that it is not without precedent
Reply With Quote
     
     
  #8943  
Old Posted Dec 2, 2023, 7:49 PM
kickback256 kickback256 is offline
Registered User
 
Join Date: Nov 2023
Location: Utah, USA
Posts: 21
Quote:
Originally Posted by ucsbgaucho View Post
Obviously the airport expansion has a direct benefit financially to Delta, wouldn't the RGP have a financial benefit to UPRR as well?
Not as much of an obvious incentive, but yes. Crossing maintenance is extremely expensive and labor intensive (both for track surface and signal reasons), as well as regular track upkeep and replacement. Ballasted track with lateral curves on wood ties (their current setup in the stretch in question) tends to deteriorate much more quickly than other types of track, and UP would get 4 1/half miles of brand new (presumably, according to the study) ballastless Continuous Welded Rail with fewer lateral curves, which is *much* easier on upkeep. Add all the new special trackwork (switches, signals, etc.), and there’s definitely some upsides. But yeah, they’re definitely playing hardball here. Typical for-profit multi-billion-dollar corporation behavior.

Last edited by kickback256; Dec 2, 2023 at 9:49 PM.
Reply With Quote
     
     
  #8944  
Old Posted Dec 7, 2023, 5:23 AM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 832
UTA is in the process of updating their signage.

Reply With Quote
     
     
  #8945  
Old Posted Dec 8, 2023, 5:05 AM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 832
The FRA did not include either of the two Utah routes in their corridor ID program.



Reply With Quote
     
     
  #8946  
Old Posted Dec 8, 2023, 7:03 AM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 832
UDOT has selected microtransit and future Light Rail for Point of The Mountain

Reply With Quote
     
     
  #8947  
Old Posted Dec 8, 2023, 6:28 PM
RC14's Avatar
RC14 RC14 is offline
Registered User
 
Join Date: May 2007
Location: Salt Lake City, Utah
Posts: 1,144
West Davis Corridor opens January 6th

The West Davis Corridor is opening ahead of schedule (January 6th). 16 miles of highway and 10 miles of hiking/biking trails.
https://kslnewsradio.com/2063967/the-west-davis-corridor-will-open-earlier-than-expected/
__________________
Real estate agent working in Salt Lake and Ogden
Reply With Quote
     
     
  #8948  
Old Posted Dec 8, 2023, 6:41 PM
bob rulz bob rulz is offline
Registered User
 
Join Date: May 2010
Location: SL,UT
Posts: 1,616
Quote:
Originally Posted by Paniolo Man View Post
UTA is in the process of updating their signage.

Why move the logo and name away from the left side and put it in tiny print underneath? Weird design choice.
Reply With Quote
     
     
  #8949  
Old Posted Dec 8, 2023, 9:48 PM
kickback256 kickback256 is offline
Registered User
 
Join Date: Nov 2023
Location: Utah, USA
Posts: 21
Quote:
Originally Posted by Paniolo Man View Post
Good catch!.
Reply With Quote
     
     
  #8950  
Old Posted Dec 8, 2023, 9:52 PM
Atlas's Avatar
Atlas Atlas is offline
Space Magi
 
Join Date: Sep 2006
Location: Salt Lake City
Posts: 2,006
TRAX Blue Line extension not considered because of anticipated public opposition. Lame.

The ROW is already there.
__________________
r/DevelopmentSLC
Reply With Quote
     
     
  #8951  
Old Posted Dec 10, 2023, 8:42 PM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 832
Reply With Quote
     
     
  #8952  
Old Posted Dec 11, 2023, 7:45 PM
Utahn Utahn is offline
Registered User
 
Join Date: Oct 2014
Location: Washington, DC
Posts: 73
Very disappointing, but I think it makes sense given the focus on routes where there was high levels of institutional support. Trying to be optimistic that UDOT and at least some Utah public officials might see this as wake up call?

Paniolo Man,

What do you think the chances are that we still see some or both of these routes restored except through the FRA long-distance rail study?


Quote:
Originally Posted by Paniolo Man View Post
The FRA did not include either of the two Utah routes in their corridor ID program.



Reply With Quote
     
     
  #8953  
Old Posted Dec 11, 2023, 8:13 PM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 832
Quote:
Originally Posted by Utahn View Post
Very disappointing, but I think it makes sense given the focus on routes where there was high levels of institutional support. Trying to be optimistic that UDOT and at least some Utah public officials might see this as wake up call?

Paniolo Man,

What do you think the chances are that we still see some or both of these routes restored except through the FRA long-distance rail study?
I think it's likely they they get chosen for the LD study, but I was also very optimistic about the corridor ID program so now I don't know what to think.
Reply With Quote
     
     
  #8954  
Old Posted Dec 12, 2023, 3:07 AM
RC14's Avatar
RC14 RC14 is offline
Registered User
 
Join Date: May 2007
Location: Salt Lake City, Utah
Posts: 1,144
I know I'm from here and I'm supposed to be excited about this but why would we have been selected for this? Salt Lake, Vegas and Boise are three of the most spread out, small to mid size cities(relative to other large cities) in America with very little population and allot of mountains and terrain in between. It doesn't seem like a natural place to invest allot of money for a rail line? What an I missing?
__________________
Real estate agent working in Salt Lake and Ogden
Reply With Quote
     
     
  #8955  
Old Posted Dec 12, 2023, 3:43 AM
Nebula3lem123's Avatar
Nebula3lem123 Nebula3lem123 is offline
high-floor train enjoyer
 
Join Date: Nov 2023
Location: South Jordan, Utah
Posts: 86
^From what I've heard, while Boise and Idaho were very enthusiatstic about the rail connection, UDOT and Utah were just going along for the show, and their lack of enthusiasm led to us missing out on the study funds. It seems that it was a similar story for the LV connection.
Reply With Quote
     
     
  #8956  
Old Posted Dec 12, 2023, 6:52 PM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 832
Why tax repeal in 3 cities won't change plans to expand FrontRunner into Box Elder County

By Carter Williams, KSL.com | Posted - Dec. 11, 2023 at 9:01 p.m.
Reply With Quote
     
     
  #8957  
Old Posted Dec 13, 2023, 3:15 PM
kickback256 kickback256 is offline
Registered User
 
Join Date: Nov 2023
Location: Utah, USA
Posts: 21
Couple more articles.


Last edited by kickback256; Dec 14, 2023 at 4:14 AM.
Reply With Quote
     
     
  #8958  
Old Posted Dec 13, 2023, 6:10 PM
Atlas's Avatar
Atlas Atlas is offline
Space Magi
 
Join Date: Sep 2006
Location: Salt Lake City
Posts: 2,006
Here's the rail alignment I support! Hopefully the Olympics can push both the RGP and TechLink to get done!



__________________
r/DevelopmentSLC
Reply With Quote
     
     
  #8959  
Old Posted Dec 13, 2023, 9:20 PM
Makid Makid is offline
Registered User
 
Join Date: Jun 2006
Posts: 2,106
My only change would be to remove the dead end for the Green Line and push it to 6th West and 4th South, then East to 4th West and then South along the ballpark spur to complete a loop.

I would eventually like to see a downtown loop route but I think we need a larger population to make it feasible, outside of a few events each year.
Reply With Quote
     
     
  #8960  
Old Posted Dec 16, 2023, 1:24 AM
Nebula3lem123's Avatar
Nebula3lem123 Nebula3lem123 is offline
high-floor train enjoyer
 
Join Date: Nov 2023
Location: South Jordan, Utah
Posts: 86
Quote:
Originally Posted by Atlas View Post
I agree! It is by far the most logical extension imo, with the caveat of allowing a potential connection on 7th south to allow looping or doing a loop using 4th south.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 10:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.