  #301  
Old Posted Nov 4, 2023, 5:16 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
Quote:
Originally Posted by Pulkvedis Pods View Post
I don't read bold faced type. That would be missing out on something too important.

Sure. And just to be snide, beyond cynical - gauging the pace at which the project is inching forward, sideways or backwards, most of us will be in retirement homes, so who will care about the designation on the title...
I somewhat agree with you on that one. It's going agonizingly slow. Hopefully 2024 gives us more to talk about. I believe the next LRT sub committee meeting is early December, so hopefully we see the design drawings then.
Reply With Quote
     
     
  #302  
Old Posted Nov 5, 2023, 2:41 AM
akiraredacted's Avatar
akiraredacted akiraredacted is offline
Registered User
 
Join Date: May 2023
Location: Hamilton
Posts: 21
Should be December 11th at 9:30 am
Reply With Quote
     
     
  #303  
Old Posted Nov 5, 2023, 2:45 AM
TheRitsman TheRitsman is offline
Registered User
 
Join Date: Sep 2017
Location: Hamilton
Posts: 3,055
Quote:
Originally Posted by TheHonestMaple View Post
I somewhat agree with you on that one. It's going agonizingly slow. Hopefully 2024 gives us more to talk about. I believe the next LRT sub committee meeting is early December, so hopefully we see the design drawings then.
Not sure if I posted here, but I think I posted on UT. Design drawings are coming Q1 2024 from last update from staff. Makes sense considering the timing of WSP and AECOM. Seems they're doing most of the detailed design work "in house" and the tender will be just for construction, not for design.
__________________
Hamilton Downtown. Huge tabletop skyline fan. Typically viewing the city from the street, not a helicopter. Cycling, transit and active transportation advocate 🚲🚍🚋

Follow me on Twitter: https://x.com/ham_bicycleguy?t=T_fx3kIXnr9MISIZNGfD4A&s=09
Reply With Quote
     
     
  #304  
Old Posted Nov 5, 2023, 2:06 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
Quote:
Originally Posted by TheRitsman View Post
Not sure if I posted here, but I think I posted on UT. Design drawings are coming Q1 2024 from last update from staff. Makes sense considering the timing of WSP and AECOM. Seems they're doing most of the detailed design work "in house" and the tender will be just for construction, not for design.
yeah that's how Metrolinx does these LRT projects. They do 15% drawings either in house, or with a subcontractor. Then it goes out for tender, and WSP/AECOM/SNC pick it up and take it to 100% and eventually construction.

Metrolinx needs to get the drawings to 15% so the bidders can understand what it is that they are bidding on. I suspect the drawings are mostly done at this point, likely just going through some final adjustments at this point.
Reply With Quote
     
     
  #305  
Old Posted Nov 8, 2023, 1:56 AM
LikeHamilton's Avatar
LikeHamilton LikeHamilton is offline
Registered User
 
Join Date: Apr 2006
Location: Hamilton, Ontario
Posts: 2,759
While Confederation Line struggles, Waterloo Region's LRT sets passenger record

Why is Waterloo Region setting new passenger records for its transit, while the O-Train continues to struggle?

Blair Crawford Nov 07, 2023 Ottawa Citizen

While OC Transpo and its Confederation Line limps along carrying just 70 per cent of its pre-pandemic passengers, Kitchener-Waterloo’s transit system–with its own new LRT–is setting ridership records.

Grand River Transit, the operator of Kitchener-Waterloo’s four-year-old LRT, called the Ion, reported 2.9 million passenger trips in September on its buses and train, an all-time high. Grand River Transit ridership is up by 44 per cent from a year ago and up 33 per cent from what it was in 2019.

https://ottawacitizen.com/news/local-new...terloo-regions-lrt-sets-passenger-record
Reply With Quote
     
     
  #306  
Old Posted Nov 8, 2023, 2:02 AM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
My guess? A large amount of government workers in Ottawa who still haven't returned full time back to the office.
Reply With Quote
     
     
  #307  
Old Posted Nov 8, 2023, 2:46 AM
TheRitsman TheRitsman is offline
Registered User
 
Join Date: Sep 2017
Location: Hamilton
Posts: 3,055
People like transit that is reliable too, Ottawa's LRT has been far from reliable. It will grow in ridership once it has a few years under it's belt. The other problem it has is that it's nowhere near anything. Many stations were built far from residential and commercial areas, and the TOD has been slow.

I'd be curious to see what some transit advocates think though. I'll ask a couple.

Edit: ya essentially lack of back to office workers. Much of Ottawa is government and Tech. Tech is basically full hybrid or WFH. I thought most government was back in office because my branch of the feds are back in office.
__________________
Hamilton Downtown. Huge tabletop skyline fan. Typically viewing the city from the street, not a helicopter. Cycling, transit and active transportation advocate 🚲🚍🚋

Follow me on Twitter: https://x.com/ham_bicycleguy?t=T_fx3kIXnr9MISIZNGfD4A&s=09

Last edited by TheRitsman; Nov 8, 2023 at 3:30 AM.
Reply With Quote
     
     
  #308  
Old Posted Nov 8, 2023, 4:31 AM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,493
Quote:
Originally Posted by TheRitsman View Post
People like transit that is reliable too, Ottawa's LRT has been far from reliable. It will grow in ridership once it has a few years under it's belt. The other problem it has is that it's nowhere near anything. Many stations were built far from residential and commercial areas, and the TOD has been slow.

I'd be curious to see what some transit advocates think though. I'll ask a couple.

Edit: ya essentially lack of back to office workers. Much of Ottawa is government and Tech. Tech is basically full hybrid or WFH. I thought most government was back in office because my branch of the feds are back in office.
I'd be curious to know how many of KW's riders are students too.

Plus Ottawa's seems less "urban" and more like a regional transit system like GO.

Government office workers (of which I am one, in Toronto for the Ontario Public Service) have been very reluctant to give up their working-from-home arrangements. I don't know about other levels of government or corporations, but the system that's been put in place for the OPS has worked very well, at least for me. Operational staff have had little choice, but those of us in policy offices who largely rely on email and Teams meetings and other communication apps really don't need to be in the office. At the same time though, I feel like "well, I have a JOB... WFH has been and continues to be a privilege, and most managers are quite flexible with the ask about days in office, so what's to complain about? People working in other sectors don't have that luxury!
Reply With Quote
     
     
  #309  
Old Posted Nov 8, 2023, 12:39 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,797
Ottawa’s old BRT system was also a success because buses went on and off it, so it didn’t matter that the transitways mostly weren’t anywhere convenient, the bus would use it to avoid traffic over long distances and then swing out for you to have a 5-10 minute ride to actually get home. The new system forces a transfer for almost all riders, since the train just runs along the transitway, and, like, that’s fine for your ride in where you transfer onto the train that shows up every 3-5 minutes, but on the way out? Where you have to transfer back onto your bus that’s every 15-20 minutes and the bus stops are now ultra-basic shelters without the heating the older transitway bus stops had for when you had to transfer?
Way less pleasant.

And that’s when the train is actually running. Seems like it’s down for at least 1 month of the year every year…
Reply With Quote
     
     
  #310  
Old Posted Nov 8, 2023, 2:11 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,884
Ottawa's LRT issue is that the west end of the line ends like 3 stops west of downtown too.

Phase 2 of the LRT will help a lot as the coverage of the LRT will be a lot more extensive.
Reply With Quote
     
     
  #311  
Old Posted Nov 15, 2023, 12:30 AM
StuffedPouch StuffedPouch is offline
Registered User
 
Join Date: Jul 2021
Posts: 15
Quote:
Originally Posted by Beedok View Post
Ottawa’s old BRT system was also a success because buses went on and off it,
The issue with the original Transitway was they never built the downtown tunnel, so you had all these buses funnelling onto two painted bus lanes. When I lived there, it was faster to walk from Mackenzie to Bay or Lebreton during rush hour because you’ll end up walking past a dozen of whatever 9X bus you needed. It was only when they started talking about building the bus tunnel, that LRT came up.

I agree that losing the single seat ride is unfortunate, but downtown Ottawa didn’t have the capacity for more buses to get shoved in.
Reply With Quote
     
     
  #312  
Old Posted Nov 15, 2023, 1:15 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,797
Quote:
Originally Posted by StuffedPouch View Post
The issue with the original Transitway was they never built the downtown tunnel, so you had all these buses funnelling onto two painted bus lanes. When I lived there, it was faster to walk from Mackenzie to Bay or Lebreton during rush hour because you’ll end up walking past a dozen of whatever 9X bus you needed. It was only when they started talking about building the bus tunnel, that LRT came up.

I agree that losing the single seat ride is unfortunate, but downtown Ottawa didn’t have the capacity for more buses to get shoved in.
They could have bought themselves a bunch more capacity by turning one of the downtown streets into a bus only one and making it two way. Use that to buy some time and then build a shorter and more urban rail rapid transit elsewhere instead of cannibalising already existing infrastructure and forcing linear transfers on people.
Or just electrified the bus network and then built a bus tunnel, since the main tunnel expense gap between rail and buses was ventilation based.
Basically anything other than what they did. Which keeps breaking and is now frequently running only a single train in the stations, so they feel massively overbuilt.
Reply With Quote
     
     
  #313  
Old Posted Nov 15, 2023, 2:45 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,884
Ottawan's just like to complain because they got used to the 1-seat bus ride.

The LRT will be better over time and will eventually prove itself, especially once phase 2 is done and people aren't transferring at Tunneys Pasture to go 3-4 stops into downtown.

The stupid part of the Ottawa LRT is that it's functionally a metro yet they went with LRT vehicles for whatever reason. That will likely end up biting Ottawa in the a** in a few decades.
Reply With Quote
     
     
  #314  
Old Posted Nov 15, 2023, 4:06 PM
ccheck7 ccheck7 is offline
Registered User
 
Join Date: Feb 2020
Posts: 34
Metrolinx has changed the LRT route to reflect the two-way conversion of Main Street by shifting it onto Dundurn and over the Main Street Bridge, with connection to the facility via Frid.

They note this will enable full reconstruction of the Main St. Bridge over the 403 and the CP tracks, enable widening of the 403 in the future, and full reconstruction of Frid Street.

https://www.metrolinx.com/en/news/important-steps-taken-towards-progressing-the-hamilton-lrt
Reply With Quote
     
     
  #315  
Old Posted Nov 15, 2023, 4:10 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,884
This confuses me. It drops the reconstruction of the Longwood bridge as a "savings" - but it's at end of life and needs to be reconstructed anyway.

Then it adds the reconstruction of the Main St bridge instead, which looks like it's in generally fine condition.

Then it mentions that it will enable "highway widening" - but the Main St bridge looks like it could accommodate an extra lane on the 403 already, while the Longwood bridge most certainly couldn't accommodate it..

Add on top of that that this introduces two separate complex turn movements for the LRT and 2+ additional signalized intersections it has to go through.. This is definitely going to add travel time.

Seems like an odd decision to me.
Reply With Quote
     
     
  #316  
Old Posted Nov 15, 2023, 4:22 PM
ccheck7 ccheck7 is offline
Registered User
 
Join Date: Feb 2020
Posts: 34
Agreed. The primary benefit from this approach seems to be it forces the MTO to play ball on ramp realignment and reconfiguration of Main to support Two-Way conversion over their ROW.
Reply With Quote
     
     
  #317  
Old Posted Nov 15, 2023, 4:32 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,884
It reeks to me of Metrolinx trying to save some money on not building the flyover and the City trying to force the 2-way conversion of Main St across the 403 on MTO.

I'll wait to see details of exactly how traffic configurations, etc. will work - but I'm not overly optimistic this change will be a positive one. The big benefit of the flyover previously proposed meant that the LRT would be fairly quick between McMaster and Downtown - it's highest ridership component. This will slow that trip down considerably.
Reply With Quote
     
     
  #318  
Old Posted Nov 15, 2023, 4:36 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
Yeah this is bad news. Ride the ION in Waterloo and you'll immediately understand why this is a mistake.
Reply With Quote
     
     
  #319  
Old Posted Nov 15, 2023, 10:05 PM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,493
I can understand the cost-cutting. But yeah, the Longwood bridge still needs to be replaced, and the city won't be able to cover that itself. Maybe it'll be part of a separate announcement for 403 work? ...next election of course

And Dundurn really needs a rebuild along that block. So while that's a good thing, there's a net savings to consider that includes the road work, not just the flyover elimination, short-term Longwood savings, and Main 403 bridge improvements (I think both the Main and King bridges and ramps were renewed about 10 years ago?).

I imagine the corners at King and Main could be made less tight by purchasing parts of the Value Buds and Fortinos plaza lots. There are many automobile movements on that part of Dundurn though, so the effects on traffic flow will be big.

While this likely does slow travel time, it is a bit more accessible to the Kirkendall neighbourhoods south of Main and the northern end of the "Innovation District" (at the cost of lower accessibility for Strathcona residents)
Reply With Quote
     
     
  #320  
Old Posted Nov 15, 2023, 10:29 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
It's not really the turn radius that will slow things down (although yes it will), it's more the traffic lights. ION LRT in KW has traffic light priority, but watch the ride videos. It is painfully slow through the downtown because of the turns and pedestrian crosswalks. i actually don't know how people justify taking the ION LRT for short trips through the downtowns. It is almost certainly faster just walking.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.