Looking over the
report to the LRT Sub-Committee (27-Oct-2023), and I have a question:
Does anyone know when they swapped Line 1 and Line 3?
According to the report:
East/West Connectors (EWC) was awarded the contract to design, build, and finance
the Confederation Line extensions. The project will extend Line 1 from Blair Station to
Trim Station in the east and from Tunney’s Pasture Station to Moodie Station (Line 1),
and to Baseline Station (Line 3).
So, the current update says that Line 1 goes from Trim, in the east, to Moodie, in the west; and that Line 3 goes from Trim to Baseline, in the west.
This is the opposite of what had previously been announced:
It is possible that this is just an error in the report. I find it hard to believe that Line 1 would be the one that is truncated during low periods, Moodie to Lincoln Fields, while Line 3 runs continuously. Although, in the grand scheme of things, I don't suppose that the numbers matter. I was just wondering if the change was real, and when it happened.