  #10441  
Old Posted Oct 2, 2023, 6:23 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,377
Quote:
Originally Posted by Unbending View Post
Marketlands? It has a retail and housing component. After demolishing the Public Safety Building, the site has become a gravel surface parking lot for the past number of years.
Man, this project sure is languishing. Wasn't it supposed to start in 2022?
     
     
  #10442  
Old Posted Oct 3, 2023, 7:29 AM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,427
Quote:
Originally Posted by FactaNV View Post
Man, this project sure is languishing. Wasn't it supposed to start in 2022?
So, might be 2040?
     
     
  #10443  
Old Posted Oct 3, 2023, 5:24 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,194
Quote:
Originally Posted by WinCitySparky View Post
lmao

Mixed use being the 🞵🞵🞵🞵🞵 🞵🞵🞵🞵
Wait, when did the Windsor change from a blues bar to a 🞵🞵🞵🞵🞵 🞵🞵🞵🞵?

I joke about it being that third proposal but lets be honest that is what everyone thought would happen when the residents were cleared and there was talk of demolition. It also had a significant surface parking lot component.

The question now is do the future developers also buy the Mitizi's parcel for the million or so ask and make it a larger, corner lot.
     
     
  #10444  
Old Posted Oct 3, 2023, 5:40 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,264
Quote:
Originally Posted by FactaNV View Post
Man, this project sure is languishing. Wasn't it supposed to start in 2022?
It’s projected to start this fall or early 2024.
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
     
     
  #10445  
Old Posted Oct 4, 2023, 4:32 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,063
NDP winning the election is good for local architects and builders. The proposal to build 9 schools all at once under a P3 model, will apparently be cancelled....thank goodness.
     
     
  #10446  
Old Posted Oct 4, 2023, 5:54 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,712
Quote:
Originally Posted by trueviking View Post
NDP winning the election is good for local architects and builders. The proposal to build 9 schools all at once under a P3 model, will apparently be cancelled....thank goodness.
This will likely cost tax payers more money.
     
     
  #10447  
Old Posted Oct 4, 2023, 5:56 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,835
Quote:
Originally Posted by trueviking View Post
NDP winning the election is good for local architects and builders. The proposal to build 9 schools all at once under a P3 model, will apparently be cancelled....thank goodness.
so now it'll be 9 schools all with different architects, blueprints, constructions crews so costs might double & take 2x longer? I'm being honest, what was wrong w doing 9 at a time? overcrowding is a huge concern, 35+ kids in classrooms
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
     
     
  #10448  
Old Posted Oct 4, 2023, 6:29 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 2,411
Quote:
Originally Posted by dmacc View Post
This will likely cost tax payers more money.
Money is for spending and investing.
     
     
  #10449  
Old Posted Oct 4, 2023, 6:30 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 2,411
Quote:
Originally Posted by trueviking View Post
NDP winning the election is good for local architects and builders. The proposal to build 9 schools all at once under a P3 model, will apparently be cancelled....thank goodness.
No kidding, P3’s are another parasitic scam by the private sector that always leave the public purse holding the bag
     
     
  #10450  
Old Posted Oct 4, 2023, 7:11 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,063
Quote:
Originally Posted by wags_in_the_peg View Post
so now it'll be 9 schools all with different architects, blueprints, constructions crews so costs might double & take 2x longer? I'm being honest, what was wrong w doing 9 at a time? overcrowding is a huge concern, 35+ kids in classrooms
A single team building 9 schools simultaneously would have meant no Manitoba companies would be large enough to do that work. Some of the larger ones might have been able to team with out-of-town groups, but a significant amount of the money spent would have gone out of the province, leaving many local contractors, engineers, architects, and other consultants shut out of work that they have built their businesses on. These companies all pay taxes and support Manitoba families.

It would also flood the subcontractor market, driving up construction costs for all other projects....Manitoba is a small market that can't handle an influx like that without impact...we saw that when the floodway was being expanded so many concrete piles were being used to build bridges that other projects had to wait for the backlog to pass.

It would not have been cheaper. It would have only meant your children would be paying for it instead of you.

It would also be bad for schools. Each have different needs. Communities have different needs.

If a school wanted to fix a broken door hinge in five years, they would have to apply through the ownershio group and have them do it.

It was tried in Alberta and Saskatchewan...both failed miserably and stopped.
     
     
  #10451  
Old Posted Oct 4, 2023, 7:50 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,835
^ ok thanks for clarification. not that I agree with it all but I see your point.
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
     
     
  #10452  
Old Posted Oct 4, 2023, 8:06 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,338
Building 9 schools at once via P3 is ridiculous.

I believe there is a place for P3's, such as roads projects. I don't believe there is a place for P3's in schools, or police stations, for that matter.

You're relying on private sector to implement and maintain these assets. In 20-30 years, you are relying on them to have saved the dollars you've paid them for future maintenance. And then actually perform maintenance on said schools.

For roads, this is rather low risk. For your children's education, I would not put reliance on the private sector in this way.
     
     
  #10453  
Old Posted Oct 4, 2023, 8:27 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,276
Quote:
Originally Posted by bomberjet View Post
Building 9 schools at once via P3 is ridiculous.

I believe there is a place for P3's, such as roads projects. I don't believe there is a place for P3's in schools, or police stations, for that matter.

You're relying on private sector to implement and maintain these assets. In 20-30 years, you are relying on them to have saved the dollars you've paid them for future maintenance. And then actually perform maintenance on said schools.

For roads, this is rather low risk. For your children's education, I would not put reliance on the private sector in this way.
I mean, it isn't like the private corporations are delivering curriculum, I am more convinced by Vike's take that the main issue is keeping manitoba money in the province. That said, I would generally be in favour of any infrastructure delivery that is done in the most efficient way possible.
__________________
"Enlightened statesmen will not always be at the helm."
Federalist #10, James Madison
     
     
  #10454  
Old Posted Oct 4, 2023, 9:11 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 2,411
Keeping money in the province is indeed important and having it leave is a major problem. Keeyask hydro dam and the Southwest Water/Sewage treatment plant construction are two examples of major high value infrastructure projects that have caused untold hundreds of millions of MB dollars leave the province because of either an out of province contractor being selected to save money, or high amounts of the workforce being from outside MB.
     
     
  #10455  
Old Posted Oct 4, 2023, 9:27 PM
Unbending's Avatar
Unbending Unbending is offline
Registered User
 
Join Date: Oct 2022
Posts: 243
Quote:
Originally Posted by trueviking View Post
NDP winning the election is good for local architects and builders. The proposal to build 9 schools all at once under a P3 model, will apparently be cancelled....thank goodness.
Sounds like great news for developers, architects, and other private companies that make a living from these types of projects. Unfortunately it’s bad news for the students living in the areas that are in desperate need for new schools and the parents paying the tax bill.
     
     
  #10456  
Old Posted Oct 4, 2023, 9:53 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 2,411
The tax bill is the tax bill. You want schools? We pay the taxes. The schools will get built. We will still pay the taxes. Nobody is getting anything for free. Taxes don’t stop because suddenly somewhere a demand for a school appears. The whole idea all these schools were going to get built simultaneously and instantaneously was never ever going to happen. The schools are going to get built at exactly the speed they were always going to get built. It is not the taxes fault. It’s a decade of failing to start a decade ago. A P3 will have never made the problem magically be solved. Then what, lower taxes to make people feel better? Watch the schools get built even slower. Honestly.
     
     
  #10457  
Old Posted Oct 4, 2023, 10:09 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,063
Quote:
Originally Posted by Unbending View Post
Sounds like great news for developers, architects, and other private companies that make a living from these types of projects. Unfortunately it’s bad news for the students living in the areas that are in desperate need for new schools and the parents paying the tax bill.
may or may not take more time. But they will get better schools for the next 100 years. Schools aren't roads. Quality and design matters....lowest common denominator schools built to maximize profit and cap maintenance costs is not the best priority.

and your children won't be on the hook to pay for them in 20 years.

P3 doesn't make it cheaper...likely makes it more expensive....it just means you pay later.
     
     
  #10458  
Old Posted Oct 4, 2023, 10:29 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 2,411
^And it doesn’t make it get built faster, that is a fallacy proven time and time again because the forces that control construction expediency have little to do with things either government or the private sector can directly control.
     
     
  #10459  
Old Posted Oct 4, 2023, 10:48 PM
Unbending's Avatar
Unbending Unbending is offline
Registered User
 
Join Date: Oct 2022
Posts: 243
Good point about lower up front costs often lead to higher costs in the long-run. It’s usually better to pay a little more up front for a better design with higher quality materials, which leads to bigger savings down the road.
     
     
  #10460  
Old Posted Oct 5, 2023, 2:55 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,712
Quote:
Originally Posted by trueviking View Post
A single team building 9 schools simultaneously would have meant no Manitoba companies would be large enough to do that work. Some of the larger ones might have been able to team with out-of-town groups, but a significant amount of the money spent would have gone out of the province, leaving many local contractors, engineers, architects, and other consultants shut out of work that they have built their businesses on. These companies all pay taxes and support Manitoba families.

It would also flood the subcontractor market, driving up construction costs for all other projects....Manitoba is a small market that can't handle an influx like that without impact...we saw that when the floodway was being expanded so many concrete piles were being used to build bridges that other projects had to wait for the backlog to pass.

It would not have been cheaper. It would have only meant your children would be paying for it instead of you.

It would also be bad for schools. Each have different needs. Communities have different needs.

If a school wanted to fix a broken door hinge in five years, they would have to apply through the ownershio group and have them do it.

It was tried in Alberta and Saskatchewan...both failed miserably and stopped.

Was the intent to build these 9 schools simultaneously or just consolidate the plans, designs and engineering while guaranteeing the successful proponent the contracts to build the schools over a determined amount of time? If the later is the case then it sounds better to do the P3 because you're locking in pricing now while also saving on the planning, design and engineering costs.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 11:40 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.