Quote:
Originally Posted by Spr0ckets
They probably didn't do themselves any favours by letting that $850 Million estimate cost (for mostly wish-list items that would almost certainly never have gotten built in the final proposal; They were never going to get or fit a convention center or events center (at a cost of more than half the estimated figure, at $460 Million or more) on that site along with a new city hall, new library, all while still having some segment of the plaza still available) leak out before the public consultation they planned to have.
|
Is this true? Any fool could see there is no space for a convention centre on that plot while still retaining some green space, let alone adding the other functions.
And besides, why would there need to be another performance space here when the (admittedly preliminary) plan is to integrate a performing arts space into the redevelopment adjacent to the bus loop?