Quote:
Originally Posted by Urban_Sky
Feel free to propose a “useful” service offering for Atlantic Canada, which would not increase VIA’s subsidy requirement or completely sacrifice the link to the Q-W Corridor with its maintenance centers (both are hard constraints imposed by Transport Canada). Oh yes, and all of that with a rail infrastructure which no longer serves population centers like Fredericton and does not support travel times (or reliability) which would be remotely competitive against the car, bus or plane.
Me and my former colleagues at VIA had to eventually accept defeat at this task, but (who knows?) maybe you have more skills, imagination or luck…
|
There is a lot to unpack here.
-No increased subsidy. So essentially requiring any new service to operate at a break-even level. I assume the provinces are unwilling or unable to cover the funding gap that would likely exist?
-Link to the Q-W corridor... so what does that actually provide latitude for? This sounds like it shuts the door on any regional service or basically any service that doesn't terminate in Montreal.
-Inadequate rail infrastructure. So what does that mean in terms of travel times? I assume the Halifax-Moncton segment is main line quality capable of supporting reasonably high operating speeds. So is the issue with everything else? Not much can be done there, if the existing rails are fine then maybe one can build a case for introducing passenger rail service... that's a lot tougher to do if it's a branch line with a 35 mph speed limit requiring hundreds of millions of dollars, if not more, in capital upgrades.
(I know you obviously know this Urban Sky, but I think there is a tendency to look at rail lines as being all the same because they look more or less alike, when in reality you can have large urban areas connected by the equivalent of an eight lane high speed superhighway, while a rural branch line is the equivalent of a narrow gravel road with speeds which reflect that.)