  #21801  
Old Posted Aug 19, 2023, 11:11 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,057
^ ^ ^ ^ ^

Not meaning to sound naive, but doesn't that timber tower (when built) present an elevated fire risk? Or is it treated in a special way with fire retardant ? ... or what? Just asking.
     
     
  #21802  
Old Posted Aug 19, 2023, 3:22 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,352
Quote:
Originally Posted by trofirhen View Post
Not meaning to sound naive, but doesn't that timber tower (when built) present an elevated fire risk? Or is it treated in a special way with fire retardant ? ... or what? Just asking.
No, current designs of cross-laminated timber buildings perform as well or better than steel or concrete framed buildings in fire tests. It's nothing like wooden framed houses with insulated gaps - the panels are solid glued lumber. In taller buildings there will be an extra layer of external gyprock to add even greater fire protection, but even exposed frames initially char on the outside, and then stop burning. The wooden elements are designed to be thick enough to not burn through in a potential fire. As the overall structure is much lighter, it's also inherently safer in the event of an earthquake. There's already an 18 storey wooden residential building at UBC's Brock Commons.
     
     
  #21803  
Old Posted Aug 19, 2023, 6:47 PM
RDW989 RDW989 is offline
Registered User
 
Join Date: Sep 2015
Location: Vancouver
Posts: 243
A development application for two infill buildings on the Peter Manor property 1755 Haro, just east of Denman -- a six-storey apartment, fronting Haro St and a three-storey townhouse, along Rosemary Brown Lane.


https://www.shapeyourcity.ca/1755-haro-st
     
     
  #21804  
Old Posted Aug 20, 2023, 9:41 PM
RDW989 RDW989 is offline
Registered User
 
Join Date: Sep 2015
Location: Vancouver
Posts: 243
The Rec Room on Granville has applied for its liquor license -- capacity 1594 people, plus 64 on patio, my pix
[IMG]url=https://flic.kr/p/2oWY9ow][/url][url=https://flic.kr/p/2oWY9ow]
     
     
  #21805  
Old Posted Aug 22, 2023, 6:06 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,395
thanks for the update on The Rec Room.....with any luck maybe it will be open by NYE?!

anyone know an ETA on with the BLOOD ALLEY MUSIC VENUE? again I am hoping by the end of the year.

https://dailyhive.com/vancouver/blood-alley-music-hall-gastown-westbank
     
     
  #21806  
Old Posted Aug 25, 2023, 11:09 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,395
crane is up for the Broadway and Birch rental tower.

also excavation and shoring is well under way for the condo at the old Chevron on West Georgia and Bidwell
     
     
  #21807  
Old Posted Aug 25, 2023, 11:10 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,395
looks like Bosa has 1700 Alberni going to presale ... and it will be 2 phases as per >>
https://bosaproperties.com/residential-portfolio/1700-alberni

and I see ads online like this >>

1700 Alberni | Downtown pre-construction. Request floor plans, price list: www.vancouvercondonetwork.com/development/1700-alberni
     
     
  #21808  
Old Posted Aug 25, 2023, 11:21 PM
GenWhy? GenWhy? is offline
Registered User
 
Join Date: Jun 2017
Posts: 4,862
"contractor has not been chosen yet"

Value Engineer phase still outstanding. Will be VERY interesting to see who they pull of the details of the exterior if they don't VE it.
     
     
  #21809  
Old Posted Aug 25, 2023, 11:24 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,228
Quote:
Originally Posted by hollywoodnorth View Post
looks like Bosa has 1700 Alberni going to presale ... and it will be 2 phases as per >>
https://bosaproperties.com/residential-portfolio/1700-alberni

and I see ads online like this >>

1700 Alberni | Downtown pre-construction. Request floor plans, price list: www.vancouvercondonetwork.com/development/1700-alberni
Likely they just mean two sales phases, I would be really surprised if they built in two phases.

Edit: A Stage 1 building permit was issued at the beginning of July for 1688 W Georgia only mentioning one 31 storey tower.

I don’t get the name, it’s the 1600 block.

Last edited by madog222; Aug 25, 2023 at 11:42 PM.
     
     
  #21810  
Old Posted Aug 25, 2023, 11:35 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,352
Quote:
Originally Posted by GenWhy? View Post
"contractor has not been chosen yet"

Value Engineer phase still outstanding. Will be VERY interesting to see who they pull of the details of the exterior if they don't VE it.
Wouldn't we expect Axiom to be the contractor? They're Bosa Properties' in-house builders, and built both Cardero and Fifteen Fifteen.
     
     
  #21811  
Old Posted Aug 26, 2023, 5:59 AM
gaviscon gaviscon is offline
Registered User
 
Join Date: Nov 2021
Posts: 772
Has anyone heard of any progress for 1045 Haro St.?
     
     
  #21812  
Old Posted Aug 26, 2023, 3:43 PM
phesto phesto is offline
Registered User
 
Join Date: Jan 2002
Location: yvr/bwi
Posts: 2,699
Quote:
Originally Posted by gaviscon View Post
Has anyone heard of any progress for 1045 Haro St.?
I've heard that it is currently mired in financial difficulties and the Chinese owner is unwilling or unable to move the project forward. I'm guessing the site will be sold, either on the market or through a foreclosure.

Of course, the outstanding issues related to the view cone and shadowing still require resolution which complicates a sale to another developer.
     
     
  #21813  
Old Posted Aug 26, 2023, 7:15 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,228
Crane is comming down at 46 W Hastings while one is going up at 52 E Hastings.
     
     
  #21814  
Old Posted Aug 27, 2023, 5:22 AM
Feathered Friend Feathered Friend is offline
Registered User
 
Join Date: Jun 2016
Posts: 2,557
95 W Hastings (aka 388 Abbott St) - Update

Quote:
Originally Posted by urbanight93 View Post
Speaking of projects in the area, anyone have an update on 95 West Hastings, which is almost right beside the Army and Navy? https://dailyhive.com/vancouver/95-west-hastings-street-vancouver-downtown-eastside?auto=true
It's been about three years since there was any public updates for 95 W Hastings, but ironically a building permit was finally submitted in May, 2023, about a month after this post.


https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=201609612
     
     
  #21815  
Old Posted Aug 27, 2023, 5:48 PM
csbvan's Avatar
csbvan csbvan is online now
Registered User
 
Join Date: Aug 2013
Location: Vancouver
Posts: 3,341
Good news. I look forward to seeing this project. Surprised a market rental mid-rise took so long for the developers to move it forward
     
     
  #21816  
Old Posted Aug 27, 2023, 5:57 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,352
Quote:
Originally Posted by csbvan View Post
Good news. I look forward to seeing this project. Surprised a market rental mid-rise took so long for the developers to move it forward
It's only 7 years since it was submitted, so they're rushing it - it is Holborn Group, after all. (Unless they've sold it).
     
     
  #21817  
Old Posted Aug 27, 2023, 7:13 PM
csbvan's Avatar
csbvan csbvan is online now
Registered User
 
Join Date: Aug 2013
Location: Vancouver
Posts: 3,341
Quote:
Originally Posted by Changing City View Post
It's only 7 years since it was submitted, so they're rushing it - it is Holborn Group, after all. (Unless they've sold it).
touché
     
     
  #21818  
Old Posted Aug 31, 2023, 4:12 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,816
From TrishJewison Twitter August 29th:


https://twitter.com/TrishJewison/status/1696655147819245769
     
     
  #21819  
Old Posted Aug 31, 2023, 11:44 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,816
980 Granville

By me today;

     
     
  #21820  
Old Posted Sep 1, 2023, 12:22 AM
C3YVR C3YVR is offline
Registered User
 
Join Date: Jan 2020
Posts: 256
Staging going up around 1078 Harwood in what looks like prep for demolition of the four existing buildings to be replaced by 1065 and 1066 Harwood.

https://www.shapeyourcity.ca/1065-harwood-st-and-1066-harwood-st
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 8:46 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.