Old Posted Aug 2, 2023, 11:25 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
The local NIMBYS in Komoka are against proposal for the old driving range site on Gideon Drive.

The growth in Komoka and Kilworth is only going to accelerate with thousands of new residents being added in the coming years.




https://www.cbc.ca/news/canada/london/de...development-pressure-in-komoka-1.6924067
Reply With Quote
     
     
  #3102  
Old Posted Aug 2, 2023, 2:08 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,298
Damn, I only saw Dr Chant a few weeks ago for a knee injection. Wish I had seen him after this news came out, I'd love to hear more. Wonder if he is planning to move his practice away from Strathroy hospital to this new location.
Reply With Quote
     
     
  #3103  
Old Posted Aug 3, 2023, 2:29 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Updates from the OLT Case Mgt Meeting on the various appeals of the London Plan from various proposals around the city. A number of the appeals have been dropped and others are requesting more time to try to resolve which means another CMM meeting in Feb 2024.



They need to make major changes to the OLT processes governing appeals because the current system is broken. Why in the world do they have another 6 month wait for another CMM meeting?


This is like a never ending trip to the dentist chair of delay after delay.



https://www.canlii.org/en/on/onlt/doc/2023/2023canlii69367/2023canlii69367.html
Reply With Quote
     
     
  #3104  
Old Posted Aug 7, 2023, 8:25 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
About 2/3rds complete now with the exterior brick and stonework on the new Chick-Fil-A restaurant on Wonderland Rd S. The concrete foundation footings have been poured for weeks now on the next retail building just further north but not much has happened with the utility rough in as of yet or any structural steel. The next building at the SW corner of Bradley and Wonderland now has the exterior walls and insulation board installed. Suspect the masonry contractor will move to this building when complete at the Chick-fil-A.
Reply With Quote
     
     
  #3105  
Old Posted Aug 10, 2023, 10:48 PM
tyeman200's Avatar
tyeman200 tyeman200 is offline
Registered User
 
Join Date: Sep 2014
Posts: 391
Quote:
Originally Posted by jammer139 View Post
Nice, work close by so been watching this project for quite some time. As for the former Holy Cross, it's a shame they didn't spare the building. It was very sound and would be perfect for a retrofit into an apartment building.
Reply With Quote
     
     
  #3106  
Old Posted Aug 11, 2023, 12:43 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Reply With Quote
     
     
  #3107  
Old Posted Aug 14, 2023, 8:26 PM
LDN LDN is offline
Registered User
 
Join Date: Jan 2023
Posts: 4
Not 100% relevant to this site, but I know a lot of people on here are very much in the know of the City's infrastructure projects, so I figured I would ask.

What has the City been doing with the water reservoir/Reservoir park the last year or so?

Access was closed for several months in the winter, and even though no longer closed off, they have been doing work on the other side of commissioners.

Streetview went by just last month. Shot looking south from commissioners:
https://www.google.ca/maps/@42.9532685,-...ZWnTOJnZC6Q!2e0!7i16384!8i8192?entry=ttu

shot from Longworth:
https://www.google.ca/maps/@42.9510515,-...n13HA7Jc0lA!2e0!7i16384!8i8192?entry=ttu

Wasn't able to find anything online.
Reply With Quote
     
     
  #3108  
Old Posted Aug 17, 2023, 11:54 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Indwell opens its latest affordable housing building in St. Thomas.



https://lfpress.com/news/local-news/indw...stern-ontario-affordable-housing-project
Reply With Quote
     
     
  #3109  
Old Posted Aug 18, 2023, 5:45 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Wrapping up the exterior brick on the Chick-Fil-A on Wonderland Rd S. Interior progress is also happening and would not be surprised to see it opened this Fall. Another building just south has the foundation walls now poured. The building north of the Tim Hortons is now getting the structural steel installed. They have also finished the insulation board install on the building at the SW corner of Bradley and Wonderland. Alot of new parking pad buildings have sprung up on this stretch of wonderland. Old Oaks has also moved fast with the commercial/light industrial buildings across the street.
Reply With Quote
     
     
  #3110  
Old Posted Aug 19, 2023, 12:35 PM
Ryeguy01 Ryeguy01 is offline
Registered User
 
Join Date: Apr 2021
Posts: 30
Quote:
Originally Posted by jammer139 View Post
Wrapping up the exterior brick on the Chick-Fil-A on Wonderland Rd S. Interior progress is also happening and would not be surprised to see it opened this Fall. Another building just south has the foundation walls now poured. The building north of the Tim Hortons is now getting the structural steel installed. They have also finished the insulation board install on the building at the SW corner of Bradley and Wonderland. Alot of new parking pad buildings have sprung up on this stretch of wonderland. Old Oaks has also moved fast with the commercial/light industrial buildings across the street.
Yes we have just a couple little things left to do like insulate the inside and we are done so I would say 3 more weeks worth of work then finished. There are 4 others going behind the others where the other enterance is on wharncliffe. Old oaks as told me to my face that they think we are one of the best construction companies around.
Reply With Quote
     
     
  #3111  
Old Posted Aug 19, 2023, 1:48 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,298
Quote:
Originally Posted by Ryeguy01 View Post
Yes we have just a couple little things left to do like insulate the inside and we are done so I would say 3 more weeks worth of work then finished. There are 4 others going behind the others where the other enterance is on wharncliffe. Old oaks as told me to my face that they think we are one of the best construction companies around.
I've been off work since the spring so I haven't been by there lately but the renovation done to the old buildings in that complex was nicely done and I imagine the new buildings will be as well. I've been dealing with businesses in that park for over 30 years and that complex was really shoddy before. Hopefully Old Oak doesn't cannibalize its own business by attracting companies to move there from Meadowbrook.
Reply With Quote
     
     
  #3112  
Old Posted Aug 19, 2023, 5:57 PM
Ryeguy01 Ryeguy01 is offline
Registered User
 
Join Date: Apr 2021
Posts: 30
Quote:
Originally Posted by Djeffery View Post
I've been off work since the spring so I haven't been by there lately but the renovation done to the old buildings in that complex was nicely done and I imagine the new buildings will be as well. I've been dealing with businesses in that park for over 30 years and that complex was really shoddy before. Hopefully Old Oak doesn't cannibalize its own business by attracting companies to move there from Meadowbrook.
I’m not sure but I do know that they had a for lease sign up and one of the truck drivers delivering our structural steel had a friend in Brampton interested in renting out some units so hopefully they are attracting more out of city businesses. I do know they didn’t want to give us the go ahead on the next set of buildings next year until some of these were already called for and we got the go ahead a month ago so I guess they already have lots of interest
Reply With Quote
     
     
  #3113  
Old Posted Aug 19, 2023, 7:22 PM
ericmacm's Avatar
ericmacm ericmacm is offline
Registered User
 
Join Date: Jul 2017
Location: SW Ontario
Posts: 974
Quote:
Originally Posted by Djeffery View Post
I've been off work since the spring so I haven't been by there lately but the renovation done to the old buildings in that complex was nicely done and I imagine the new buildings will be as well. I've been dealing with businesses in that park for over 30 years and that complex was really shoddy before. Hopefully Old Oak doesn't cannibalize its own business by attracting companies to move there from Meadowbrook.
Meadowbrook is owned by Bluestone now, not Old Oak.
__________________
Opinions expressed here are solely my own.

Come See My Work: Pan-Canadian Skylines Project​​​ | Astrophotography Thread
Reply With Quote
     
     
  #3114  
Old Posted Aug 19, 2023, 7:43 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Bluestone, Summit and Old Oaks are all the same family.






Quote:
Originally Posted by ericmacm View Post
Meadowbrook is owned by Bluestone now, not Old Oak.
Reply With Quote
     
     
  #3115  
Old Posted Aug 20, 2023, 2:30 AM
tyeman200's Avatar
tyeman200 tyeman200 is offline
Registered User
 
Join Date: Sep 2014
Posts: 391
The new McDonalds on Wharncliffe By Southdale is coming along well. Won't be long before they get the exterior cladding/brickwork done. But really looking forward to the Chick-fil-a.
Reply With Quote
     
     
  #3116  
Old Posted Aug 20, 2023, 5:50 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Site prep was completed this past spring and construction has now started on these 3s townhomes at 360 Callaway Rd by Wastdell Developments. The foundations have been poured and framing has already begun for the first units on the east side of the block.



The plan consists of fifty-three (53) dwelling units within
multiple townhouses and a new private road providing access from Callaway Road.
The applicant’s intent is to register the development as one Condominium Corporation.


Planning document linked below has renders.



https://pub-london.escribemeetings.com/filestream.ashx?DocumentId=82721
Reply With Quote
     
     
  #3117  
Old Posted Aug 21, 2023, 7:27 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Bluestone Developments has put up a sign on Pond Mills Rd for an upcoming development proposal.


Don't see anything on the City planning website as of yet.


They have an entry on their own website about a future 11s and 133 suite building.



https://bluestone-developments.com/


This would make 3 proposals for them on the future timeline: Gainsborough Rd and Sheffield Blvd.


Which one they decide to move on first will be interesting to see.
Reply With Quote
     
     
  #3118  
Old Posted Aug 25, 2023, 5:10 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Additional funding to enlarge future Woodstock elementary school.



https://www.cbc.ca/news/canada/london/fu...nded-to-meet-population-growth-1.6947635
Reply With Quote
     
     
  #3119  
Old Posted Aug 25, 2023, 6:33 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,298
Quote:
Originally Posted by jammer139 View Post
Additional funding to enlarge future Woodstock elementary school.



https://www.cbc.ca/news/canada/london/fu...nded-to-meet-population-growth-1.6947635
That's good to see, given the development on the old golf course starting up now. A school is desperately needed in that area. One of my co-workers lives in the neighbourhood and his kids get bused to Tavistock, a good 20-25 minutes north of Woodstock and constant snow days when the buses are cancelled.
Reply With Quote
     
     
  #3120  
Old Posted Aug 29, 2023, 7:24 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,308
Hole left by fire in Aylmer finally gets a demolition permit to clear the site.


Why would it take so long to issue a permit?



https://london.ctvnews.ca/hole-in-the-heart-of-aylmer-ont-to-be-cleaned-up-1.6539518

Last edited by jammer139; Aug 30, 2023 at 4:32 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 1:48 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.