Old Posted Aug 18, 2023, 8:56 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,914
Quote:
Originally Posted by MonctonRad View Post
There is a bulldozer busy moving some earth at 1299 Main (NW corner of Main & Vaughan Harvey). Is this the beginning of site prep???

Still very disappointing that they went from 10 floors to 6. Especially when the developer originally said they needed the extra floors to be financially viable.
Reply With Quote
     
     
  #7242  
Old Posted Aug 18, 2023, 9:10 PM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is online now
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
Quote:
Originally Posted by jonny golden View Post
Still very disappointing that they went from 10 floors to 6. Especially when the developer originally said they needed the extra floors to be financially viable.
More to believe that they will keep it at 10 then because they "had no choice" but to keep it at 10 with the current market conditions. Here's to hoping for a surprise return to their originals plans.
Reply With Quote
     
     
  #7243  
Old Posted Aug 18, 2023, 9:31 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,914
Quote:
Originally Posted by MonctonRad View Post
This will likely be the sum total of economic activity on this lot for at least the next two years. Socioeconomic factors are not currently favourable for the proponent at present.

High crime, rampant homelessness and uncontrolled drug use are a problem for the proponent. High interest rates, inflation, supply chain issues and labour shortages are serious issues for every single developer in greater Moncton (and the rest of Canada).

We are in the eye of the storm. No wonder PAC has been so quiet this year.............
I just came across this story from Global News stating that 1 in 5 (20%) home builders are cancelling projects because of high interest rates. Obviously it's a major factor.

Housing starts across Canada for the month of July were down a whopping 10% despite the extraordinary demand.

Hopefully rates will start to decline so some of our major projects can get under way.

https://globalnews.ca/news/9903071/pre-sale-home-cancellations-delays/
Reply With Quote
     
     
  #7244  
Old Posted Aug 22, 2023, 1:16 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,981
Official groundbreaking for the new $56M coronary care unit for the Moncton Hospital


T&T photo

https://tj.news/times-and-transcript/102157114# (paywall)

The expansion will slightly increase the capacity of the CCU and cardiac step down units, and will improve workflow as these two units will now be side to side. The workspace will be state of the art and fully outfitted with modern equipment. While intensive procedures and surgeries will still be performed at the NB Heart Centre at the SJRH, the new unit will allow patients to be more rapidly transferred back to Moncton following surgery.



The new unit will be constructed in the former staff parking lot in behind the Dr. Sheldon Rubin Oncology Clinic and should be open by June 2026.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7245  
Old Posted Aug 22, 2023, 2:04 PM
Mattyyy Mattyyy is offline
Registered User
 
Join Date: Nov 2011
Posts: 361
From Dawn Arnold's post regarding public session of city council yesterday:

2. Awarded a contract for downtown municipal upgrades Phase 1 (Fram Enterprises=$3,800,000);

Would this be for work on Lutz or could it be for the new street behind assumption?
Reply With Quote
     
     
  #7246  
Old Posted Aug 22, 2023, 2:08 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,981
Quote:
Originally Posted by Mattyyy View Post
From Dawn Arnold's post regarding public session of city council yesterday:

2. Awarded a contract for downtown municipal upgrades Phase 1 (Fram Enterprises=$3,800,000);

Would this be for work on Lutz or could it be for the new street behind assumption?
Lutz most likely. The new street behind Assumption Place will be a later phase project.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7247  
Old Posted Aug 22, 2023, 9:30 PM
infinityaerials infinityaerials is offline
Registered User
 
Join Date: Aug 2022
Posts: 18
Quote:
Originally Posted by Mattyyy View Post
From Dawn Arnold's post regarding public session of city council yesterday:

2. Awarded a contract for downtown municipal upgrades Phase 1 (Fram Enterprises=$3,800,000);

Would this be for work on Lutz or could it be for the new street behind assumption?

Very interesting!
Reply With Quote
     
     
  #7248  
Old Posted Aug 22, 2023, 10:00 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,914
Quote:
Originally Posted by MonctonRad View Post
Lutz most likely. The new street behind Assumption Place will be a later phase project.
If I understand correctly, they'll be raising Assomption Blvd. and updating the underground services before creating the new east/west street.

And Lutz Street sorely needs this upgrade.
Reply With Quote
     
     
  #7249  
Old Posted Aug 23, 2023, 3:37 AM
BlackYear's Avatar
BlackYear BlackYear is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,272
Lutz street from Queen all the way down to Record street has been spray painted with ground markers to detect electrical/gas/etc underground on the road and sidewalks for about 2 weeks now. So reconstruction/street closure coming soon. Only 20 years overdue.
Reply With Quote
     
     
  #7250  
Old Posted Aug 23, 2023, 11:14 AM
jnaygull jnaygull is offline
Registered User
 
Join Date: Jun 2023
Posts: 181
Quote:
Originally Posted by BlackYear View Post
Lutz street from Queen all the way down to Record street has been spray painted with ground markers to detect electrical/gas/etc underground on the road and sidewalks for about 2 weeks now. So reconstruction/street closure coming soon. Only 20 years overdue.
That was once the bumpiest street in Moncton... however, in recent years, the rest of the city caught up. Lutz isn't so bad now.

That being said, I'm glad it's getting a facelift. I hope Main St gets a strip and resurface soon, it's embarrassing how bumpy and patchwork that street is.
Reply With Quote
     
     
  #7251  
Old Posted Aug 23, 2023, 11:42 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,981
1st phase of major downtown Moncton infrastructure work set to start
Work will see Westmorland 'surcharged,' relocation of electrical and communications lines
Shane Magee · CBC News · Posted: Aug 23, 2023 7:30 AM ADT | Last Updated: 1 hour ago
https://www.cbc.ca/news/canada/new-bruns...n-redevelopment-infrastructure-1.6943699

This excellent CBC article contains the entire scoop pertaining to this contract. I could not summarize it any better if I tried. The current contract is limited to Westmorland Street and relocation of sewer and electrical in the Assumption Place parking lot. The work on Lutz Street is a separate contract, but is imminent.


Red lines show the locations of work on Westmorland Street and where work on an underground sewer line in the Assomption Place parking lot will take place. (City of Moncton) CBC photo
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7252  
Old Posted Aug 23, 2023, 1:46 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,981


One throwaway bit of information in the CBC article is that Ashford is deferring making any announcements or releasing any renders of their project until the city releases the results of it's study on the feasibility of adding a convention or conference space to the development.

This study will be released this fall, so, I fully expect not to see any Ashford renders until after the new year, most likely next spring or summer.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7253  
Old Posted Aug 23, 2023, 9:08 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,914
The idea of a convention center is intriguing. I think it would be a great addition, and bring a lot of visitors and money into the downtown.

We're going to see a lot of construction in this area for some time. Compared to what it looks like now, in a few years we won't recognize the place.
Reply With Quote
     
     
  #7254  
Old Posted Aug 25, 2023, 1:48 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,981
Quote:
Originally Posted by MonctonRad View Post
There is a bulldozer busy moving some earth at 1299 Main (NW corner of Main & Vaughan Harvey). Is this the beginning of site prep???

The bulldozer has disappeared after moving around a small amount of dirt. There are a few new survey stakes on site, but, aside from this, it is <crickets> again.

Another false alarm.........
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7255  
Old Posted Aug 25, 2023, 1:10 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,981
Quote:
Originally Posted by jonny golden View Post
The idea of a convention center is intriguing. I think it would be a great addition, and bring a lot of visitors and money into the downtown.

We're going to see a lot of construction in this area for some time. Compared to what it looks like now, in a few years we won't recognize the place.
I wonder if the talk of a possible convention facility might indicate a new hotel as part of the development?

This might indicate a second tower to go along with the residential tower.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7256  
Old Posted Aug 25, 2023, 3:05 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,914
Quote:
Originally Posted by MonctonRad View Post
I wonder if the talk of a possible convention facility might indicate a new hotel as part of the development?

This might indicate a second tower to go along with the residential tower.
Excellent point. A hotel with convention center is a natural combination, which would bring a lot of people and business into the core. And with residential tower(s) in addition, you'd have to think that this would spawn other businesses nearby.

Like I said, we won't recognize the area in a few years.
Reply With Quote
     
     
  #7257  
Old Posted Aug 25, 2023, 3:17 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,914
Quote:
Originally Posted by MonctonRad View Post
The bulldozer has disappeared after moving around a small amount of dirt. There are a few new survey stakes on site, but, aside from this, it is <crickets> again.

Another false alarm.........
I just hope that the delay with this project is because the developer is crunching the numbers and will eventually decide that 10 floors is the better option.

A very important location like this one needs a noteworthy development, and the community sorely needs the housing.
Reply With Quote
     
     
  #7258  
Old Posted Aug 25, 2023, 6:16 PM
jnaygull jnaygull is offline
Registered User
 
Join Date: Jun 2023
Posts: 181
Quote:
Originally Posted by jonny golden View Post
I just hope that the delay with this project is because the developer is crunching the numbers and will eventually decide that 10 floors is the better option.

A very important location like this one needs a noteworthy development, and the community sorely needs the housing.
I sure hope the tomatoes in the area had a bumper crop this year.

Talk about pulling the wind out of the sails of a project. That being said, nobody knows if that petition derailed this project or not except the developers.
Reply With Quote
     
     
  #7259  
Old Posted Aug 26, 2023, 11:19 PM
Riberview Riberview is offline
Registered User
 
Join Date: Nov 2020
Posts: 266
Quote:
Originally Posted by MonctonRad View Post
I wonder if the talk of a possible convention facility might indicate a new hotel as part of the development?

This might indicate a second tower to go along with the residential tower.
Hold on to your hat. Big news coming
Reply With Quote
     
     
  #7260  
Old Posted Aug 26, 2023, 11:54 PM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is online now
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
Quote:
Originally Posted by Riberview View Post
Hold on to your hat. Big news coming
Can you say when?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 3:35 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.