Quote:
Originally Posted by sonysnob
|
Oh wow, that is quite the rock fill for both roadways.
Ps: Now that I think about it, the 2 cross roads are a bit close if they can be captured in the same photo at this scale.
Quote:
Originally Posted by Innsertnamehere
It has an AADT of what, like 4,000 at most? Full grade separation is really total overkill.
The frustrating part is them keeping the speed limit at 90 after completion - it should at least increase to 100.
|
I wonder whether it’s better to bump it to 100 kph if and when all 110 KM between T Bay and Nipigon is done.
Hopefully it means that we can focus on TCH around Kenora after this.