  #8701  
Old Posted Nov 15, 2018, 3:11 PM
Lugnut Lugnut is offline
Registered User
 
Join Date: Jun 2011
Posts: 134
Quote:
Originally Posted by J.OT13 View Post
Amazing video, thanks for posting that.

One of the things I wish Waterloo Region had done with their LRT project is cover/enclose the stations the way you guys did.
     
     
  #8702  
Old Posted Nov 15, 2018, 4:05 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,590
Quote:
Originally Posted by Lugnut View Post
Amazing video, thanks for posting that.

One of the things I wish Waterloo Region had done with their LRT project is cover/enclose the stations the way you guys did.
I also think Waterloo Region's LRT would be better with trains.
     
     
  #8703  
Old Posted Nov 15, 2018, 4:18 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by J.OT13 View Post
I assume they went with Tunney's because it is a significant employment destination, minimizing the number of transfers to rail.
I'm biased because I live next to Westboro station, but I think objectively speaking, it would have been better to end Phase 1 at Westboro station, but with buses from the west continuing to run from Westboro to Tunney's Pasture until Phase 2 opens, with buses pulling into both stations. My logic is that this would have made bus transfer arrangements more manageable. Bus passengers from the west bound for downtown would get off the bus at Westboro to transfer to the LRT, while those bound for Tunney's would stay on. This would make the western terminus of the line a less hectic transfer point.

Ending at Dominion would have been problematic because at the time they were planning Phase 1 they weren't sure about how the extension to Lincoln Fields was going to proceed and the exact placement of Dominion would have potentially compromised some of the options, but Westboro would not have interfered with any of these plans. Furthermore, it wouldn't have cost much more.
     
     
  #8704  
Old Posted Nov 15, 2018, 4:43 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,055
Westboro probably doesn't, and Dominion certainly doesn't, have enough room for the bus portion of a bus:LRT interface.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #8705  
Old Posted Nov 15, 2018, 5:01 PM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Quote:
Originally Posted by CityTech View Post
I'm biased because I live next to Westboro station, but I think objectively speaking, it would have been better to end Phase 1 at Westboro station, but with buses from the west continuing to run from Westboro to Tunney's Pasture until Phase 2 opens, with buses pulling into both stations. My logic is that this would have made bus transfer arrangements more manageable. Bus passengers from the west bound for downtown would get off the bus at Westboro to transfer to the LRT, while those bound for Tunney's would stay on. This would make the western terminus of the line a less hectic transfer point.

Ending at Dominion would have been problematic because at the time they were planning Phase 1 they weren't sure about how the extension to Lincoln Fields was going to proceed and the exact placement of Dominion would have potentially compromised some of the options, but Westboro would not have interfered with any of these plans. Furthermore, it wouldn't have cost much more.
Why would people get off one stop early, than at the last stop if they're going to the same place? While yes there would be some people who'd do that I'd argue that most people would just carry on to tunney's to get onto the LRT.
     
     
  #8706  
Old Posted Nov 15, 2018, 5:37 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by Uhuniau View Post
Westboro probably doesn't, and Dominion certainly doesn't, have enough room for the bus portion of a bus:LRT interface.
I was wondering about this, so I checked Google Earth. I think Westboro probably would have had room. Unless I am missing something.
__________________
Loin des yeux, loin du coeur.
     
     
  #8707  
Old Posted Nov 15, 2018, 5:38 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by Lugnut View Post
Amazing video, thanks for posting that.

One of the things I wish Waterloo Region had done with their LRT project is cover/enclose the stations the way you guys did.
So what did they do for ION? Glorified bus shelters or something? Did they at least install heating elements for cold weather?

OC Transpo's Transitway BRT had/has *mostly* enclosed stations all along its network. Though not sure about heating elements.
__________________
Loin des yeux, loin du coeur.
     
     
  #8708  
Old Posted Nov 15, 2018, 5:53 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
Quote:
Originally Posted by CityTech View Post
I'm biased because I live next to Westboro station, but I think objectively speaking, it would have been better to end Phase 1 at Westboro station, but with buses from the west continuing to run from Westboro to Tunney's Pasture until Phase 2 opens, with buses pulling into both stations. My logic is that this would have made bus transfer arrangements more manageable. Bus passengers from the west bound for downtown would get off the bus at Westboro to transfer to the LRT, while those bound for Tunney's would stay on. This would make the western terminus of the line a less hectic transfer point.
In my opinion, the ideal Stage 1 would have been Hurdman to Lincoln Fields. This would have lumped all the painful parts of the transition in one blow. Both terminals being Transitway nodes would have had long term use for the bus transfer points. I think a fully automated metro standard running this length would have sufficed for decades
     
     
  #8709  
Old Posted Nov 15, 2018, 7:02 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by Kitchissippi View Post
In my opinion, the ideal Stage 1 would have been Hurdman to Lincoln Fields. This would have lumped all the painful parts of the transition in one blow. Both terminals being Transitway nodes would have had long term use for the bus transfer points. I think a fully automated metro standard running this length would have sufficed for decades
I like the idea of stopping at Westboro for logistical reasons given that the "ditch" and right of way is already there and there is probably sufficient space around the station for local bus pads and such.

On an east-west axis, it's also just about where the traditional inner city built form ends while going west.

While going to Lincoln Fields would be great, there isn't even an existing Transitway corridor to that station, and hammering something out with the NCC or whatever would have been a huge pain. It may have been as complicated and costly as the section through downtown - OK, maybe I'm exaggerating. But not that much, really.
__________________
Loin des yeux, loin du coeur.
     
     
  #8710  
Old Posted Nov 15, 2018, 7:04 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Also, stopping at Hurdman made little sense as it's solely a transfer point and not a "destination" for anything.

Plus you had low-hanging-fruit going east to actual destinations like St-Laurent and Blair, with the rights of way and grade separations already in place for the entire route.
__________________
Loin des yeux, loin du coeur.
     
     
  #8711  
Old Posted Nov 15, 2018, 7:31 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,590
Quote:
Originally Posted by Acajack View Post
So what did they do for ION? Glorified bus shelters or something? Did they at least install heating elements for cold weather?

OC Transpo's Transitway BRT had/has *mostly* enclosed stations all along its network. Though not sure about heating elements.
Yep, the ION has stations that resemble the Toronto streetcar shelters on Spadina and St. Clair (although most are centre platforms). I don't think there are any mostly-enclosed stations.
     
     
  #8712  
Old Posted Nov 15, 2018, 7:50 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by phil235 View Post
Yep, the ION has stations that resemble the Toronto streetcar shelters on Spadina and St. UI Clair (although most are centre platforms). I don't think there are any mostly-enclosed stations.
I just noticed that on ION's website, they refer to ''stops'' and not ''stations''.
__________________
Loin des yeux, loin du coeur.
     
     
  #8713  
Old Posted Nov 15, 2018, 8:01 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,786
ION is closer to a streetcar line while Confederation Line is closer to a metro. The difference in expected ridership and frequency is in line with that difference. Station sizes and amenities are consistent.
     
     
  #8714  
Old Posted Nov 15, 2018, 8:42 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Acajack View Post
While going to Lincoln Fields would be great, there isn't even an existing Transitway corridor to that station, and hammering something out with the NCC or whatever would have been a huge pain. It may have been as complicated and costly as the section through downtown - OK, maybe I'm exaggerating. But not that much, really.
You are bang on. It took several years of negotiations with the NCC to agree on a route between Dominion and Lincoln Fields for Stage 2. That would have delayed the opening of the line until at least 2020 if not 2021. The cost increase would also have been substantial. Better to get it built part way sooner and figure out the extension later.
     
     
  #8715  
Old Posted Nov 15, 2018, 8:44 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by phil235 View Post
I also think Waterloo Region's LRT would be better with trains.
And the Confederation Line would be better with stations.
     
     
  #8716  
Old Posted Nov 15, 2018, 8:58 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by roger1818 View Post
You are bang on. It took several years of negotiations with the NCC to agree on a route between Dominion and Lincoln Fields for Stage 2. That would have delayed the opening of the line until at least 2020 if not 2021. The cost increase would also have been substantial. Better to get it built part way sooner and figure out the extension later.
In fairness, I suppose that having the buses runs on the (relatively) uncongested western parkway with the NCC's blessing seemed like a really good idea at the time.

But it has had the effect of compromising the logical evolution of rapid transit in the west end of Ottawa. With the most obvious result the eastwardly lopsided (when you look at it on a map) first phase of the Confederation Line.
__________________
Loin des yeux, loin du coeur.
     
     
  #8717  
Old Posted Nov 16, 2018, 1:20 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,940
I attended some of the early public consultations, nearly a decade ago. They also cited Orleans having some of the highest transit ridership as part of the reason for picking the Eastern alignment first. It was both easier to do. And the return on bus operations savings was substantial. In short, it offered the best ROI.
     
     
  #8718  
Old Posted Nov 16, 2018, 6:46 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,869
Why are Rideau's stairs and escalators aligned while Parliament's are way offset?



     
     
  #8719  
Old Posted Nov 16, 2018, 10:09 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
Why are Rideau's stairs and escalators aligned while Parliament's are way offset?



For the panache? I can't think of any technical reason.
     
     
  #8720  
Old Posted Nov 16, 2018, 12:10 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Perhaps to encourage people to take the shorter flight of stairs at Parliament by putting them first. You can't reasonably do the same at Rideau since it's so deep.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.