HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #3941  
Old Posted Oct 7, 2015, 12:19 AM
Treesplease Treesplease is offline
Registered User
 
Join Date: Jul 2011
Posts: 990
Quote:
Originally Posted by Golks View Post
I

It wasn't repaved twice.
how would you describe what happened on south broad last fall and this fall?
     
     
  #3942  
Old Posted Oct 7, 2015, 12:48 AM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 989
Quote:
Originally Posted by Stormer View Post
How about those good looking curbs on Regina's main avenue
Well, the City had planned to repave Albert from Saskatchewan Drive to College Avenue way back in 2010 but held off re-doing the 1800 block because of construction of the new 4-story office on Albert @ 11th, and the 1900 block because of construction on Capital Pointe. The plan was to replace curbs and repave those blocks once both projects were built. Perhaps this would explain why the sidewalk/roadway in front of the office building is the unfinished mess that it is.
________________

Also: I have noticed on the backside of this office building that there is a man-door on the 2nd, 3rd and 4th floors that currently lead to nowhere. It appears as if these doors were recently added - possibly for a future fire escape. Careful, that first step is a big one!
________________

Another head shaker: the City (or their contractors) replaced curbs and medians as well as repaved Albert North a few weeks ago, but someone forgot to replace the curb/handicap access ramp they had ripped out at the south-east corner of Albert & 6th Avenue North. They came back weeks later and used asphalt to create a sidewalk and curb while they had used concrete on the other 3 corners of this intersection. Brilliant
     
     
  #3943  
Old Posted Oct 7, 2015, 12:53 AM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
Quote:
Originally Posted by Draftsman View Post
Also: I have noticed on the backside of this office building that there is a man-door on the 2nd, 3rd and 4th floors that currently lead to nowhere. It appears as if these doors were recently added - possibly for a future fire escape. Careful, that first step is a big one!
Those have been since the beginning. They are for access points for loading building materials.
Quote:
Originally Posted by Draftsman View Post
Another head shaker: the City (or their contractors) replaced curbs and medians as well as repaved Albert North a few weeks ago, but someone forgot to replace the curb/handicap access ramp they had ripped out at the south-east corner of Albert & 6th Avenue North. They came back weeks later and used asphalt to create a sidewalk and curb while they had used concrete on the other 3 corners of this intersection. Brilliant
You get what you pay for. And when the city is obligated to always take the lowest bidder, regardless of the quality of work as long as it meets the purchasing department's arbitrary standard...
     
     
  #3944  
Old Posted Oct 7, 2015, 1:28 AM
Golks Golks is offline
Registered User
 
Join Date: Dec 2007
Location: Regina, SK
Posts: 119
Quote:
Originally Posted by Treesplease View Post
how would you describe what happened on south broad last fall and this fall?
I dont want to get into too much detail because you would probably get bored, but here you go.

First you have to understand that the whole section of roadway from the Hillsdale intersection to Broadway was redesigned. This included changing the drainage because of the issues with standing water in several spots.

So last year for the most part the concrete medians and the intersection at Lakeshore were redone. After the concrete crews were done the paving crews came in and began to build up the areas where there were elevation/slope changes. This also filled in the cuts in the road where the new concrete was poured and made those safe for traffic use over the winter.

This year concrete crews came in and redid the outside curb and sidewalk. Paving crews came in when they were done and put down the final layer(s) of asphalt and the job is now completed.

So to make things short and simple. The project was spread out over two years. It was a big job. A lot of concrete was poured and a lot of asphalt was laid.
     
     
  #3945  
Old Posted Oct 7, 2015, 1:35 AM
Golks Golks is offline
Registered User
 
Join Date: Dec 2007
Location: Regina, SK
Posts: 119
Quote:
Originally Posted by Draftsman View Post
Well, the City had planned to repave Albert from Saskatchewan Drive to College Avenue way back in 2010 but held off re-doing the 1800 block because of construction of the new 4-story office on Albert @ 11th, and the 1900 block because of construction on Capital Pointe. The plan was to replace curbs and repave those blocks once both projects were built. Perhaps this would explain why the sidewalk/roadway in front of the office building is the unfinished mess that it is.
True.

Quote:
Another head shaker: the City (or their contractors) replaced curbs and medians as well as repaved Albert North a few weeks ago, but someone forgot to replace the curb/handicap access ramp they had ripped out at the south-east corner of Albert & 6th Avenue North. They came back weeks later and used asphalt to create a sidewalk and curb while they had used concrete on the other 3 corners of this intersection. Brilliant
That intersection and part of Albert heading north of there is being redone next year. I don't think the final plans for that intersection are done yet. Instead of pouring concrete to replace the old stuff only to tear it out next year and re-pour it differently, a crew replaced it with asphalt to make it useable/safe until next year.
     
     
  #3946  
Old Posted Oct 7, 2015, 3:19 AM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
Quote:
Originally Posted by BrutallyDishonest2 View Post
Said like someone who has never talked to a manager at the city.

It is more cost effective to repave high traffic locations regularly than to let it fall apart. Budgets exist. The citizen's of Regina continue to reject any notion of a tax increase so we remain in this hole.
Wow now you're an apologist for obvious City incompetence. Believe me I have talked to many managers at the City including the ones in charge of this project and their justifications are dubious at best.
     
     
  #3947  
Old Posted Oct 7, 2015, 3:36 AM
Treesplease Treesplease is offline
Registered User
 
Join Date: Jul 2011
Posts: 990
Quote:
Originally Posted by Golks View Post
I dont want to get into too much detail because you would probably get bored, but here you go.

First you have to understand that the whole section of roadway from the Hillsdale intersection to Broadway was redesigned. This included changing the drainage because of the issues with standing water in several spots.

So last year for the most part the concrete medians and the intersection at Lakeshore were redone. After the concrete crews were done the paving crews came in and began to build up the areas where there were elevation/slope changes. This also filled in the cuts in the road where the new concrete was poured and made those safe for traffic use over the winter.

This year concrete crews came in and redid the outside curb and sidewalk. Paving crews came in when they were done and put down the final layer(s) of asphalt and the job is now completed.

So to make things short and simple. The project was spread out over two years. It was a big job. A lot of concrete was poured and a lot of asphalt was laid.
Thanks. I realized based on the 1"-2" differential between the concrete meridian and the north bound lane it likely wasn't done last year but why strip both north and southbound lanes and repave - seems like a waste in not doing it all last fall. The pavement strippers (whatever the machine is called) and the 1 yr old pavement they ripped up isn't cheap. Sorry for ragging but the construction delays on broad over the last 4 years have made me apoplectic at times. Good news is I could drive without a lid on my coffee (don't but could).
     
     
  #3948  
Old Posted Oct 7, 2015, 4:08 AM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
Quote:
Originally Posted by Stormer View Post
Wow now you're an apologist for obvious City incompetence. Believe me I have talked to many managers at the City including the ones in charge of this project and their justifications are dubious at best.
So you're an armchair engineer and business analyst? Because you know city employees are not people and just love being shit on.

Golks has already explained that you are factually mistaken.
     
     
  #3949  
Old Posted Oct 7, 2015, 4:25 AM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
Quote:
Originally Posted by BrutallyDishonest2 View Post
So you're an armchair engineer and business analyst? Because you know city employees are not people and just love being shit on.

Golks has already explained that you are factually mistaken.



Where?
     
     
  #3950  
Old Posted Oct 7, 2015, 10:30 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
Two more big multifamily projects on tap tonight at the RPC:

Porchlight -150 units in HL

Northern - 276 units Greens on Gardiner
     
     
  #3951  
Old Posted Oct 8, 2015, 12:07 AM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
The Leader Post is relocating its press ops to Saskatoon. Crap!
     
     
  #3952  
Old Posted Oct 8, 2015, 1:15 AM
brithgob brithgob is offline
Registered User
 
Join Date: Dec 2006
Posts: 833
Quote:
Originally Posted by SkydivePilot View Post
The Leader Post is relocating its press ops to Saskatoon. Crap!
Darrell Davis, formerly of the LP, said on Twitter it may have to do with the Leader-Post pressroom being unionized, and not the SP.
     
     
  #3953  
Old Posted Oct 8, 2015, 1:22 AM
saskdave saskdave is offline
Registered User
 
Join Date: Jul 2008
Posts: 82
DSW coming to Regina

Shoe lovers rejoice....DSW is coming ...

http://www.retail-insider.com/retail-insider/2015/10/dsw
     
     
  #3954  
Old Posted Oct 8, 2015, 3:12 PM
wacko wacko is offline
Registered User
 
Join Date: Jun 2011
Location: Saskatchewan
Posts: 419
I have heard, at least for residential streets, that the city will be maintaining newer/repaved sections more frequently than before, so that the roads are kept up and don't fall into the same state of disrepair they were allowed to before. Replacing the top layer of asphalt more often apparently costs less, and lengthens the time until a much more expensive full rebuild of the road is required. At the same time, the city will still continue to repair/rebuild roads that need it, but of course they can only do so much in any given year.

Not sure if the same methodology would apply for arterial roads like Albert and Broad, but I suppose that would make sense as well.
     
     
  #3955  
Old Posted Oct 8, 2015, 5:16 PM
Chorduroy's Avatar
Chorduroy Chorduroy is offline
Registered User
 
Join Date: Dec 2012
Location: YQR
Posts: 174
Does anyone know how to find out who owns a commercial property in Regina? Say if something has been sitting empty for years and there is an idea for retail ....
     
     
  #3956  
Old Posted Oct 8, 2015, 6:10 PM
HomerSPC's Avatar
HomerSPC HomerSPC is offline
Registered User
 
Join Date: Apr 2014
Location: Regina, Sk
Posts: 459
Quote:
Originally Posted by Chorduroy View Post
Does anyone know how to find out who owns a commercial property in Regina? Say if something has been sitting empty for years and there is an idea for retail ....
Probably give the city a call.
     
     
  #3957  
Old Posted Oct 8, 2015, 6:49 PM
babo's Avatar
babo babo is offline
Regina rhymes with fun!
 
Join Date: Sep 2006
Location: I don't like elevators.
Posts: 361
Quote:
Originally Posted by Golks View Post
First you have to understand that the whole section of roadway from the Hillsdale intersection to Broadway was redesigned. This included changing the drainage because of the issues with standing water in several spots.
Whoever is responsible for maintaining Wascana Parkway really needs to relocate the swimming pool that forms in the eastbound lane, east of the Grant Road intersection (50.409363, -104.592824), whenever there's a precipitation event.
     
     
  #3958  
Old Posted Oct 8, 2015, 6:51 PM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
Call a commercial relator or have a lien check done.
     
     
  #3959  
Old Posted Oct 8, 2015, 6:55 PM
babo's Avatar
babo babo is offline
Regina rhymes with fun!
 
Join Date: Sep 2006
Location: I don't like elevators.
Posts: 361
Quote:
Originally Posted by brithgob View Post
Darrell Davis, formerly of the LP, said on Twitter it may have to do with the Leader-Post pressroom being unionized, and not the SP.
Is it also true that the page layout of the Leader Post is done in the Philippines?
     
     
  #3960  
Old Posted Oct 8, 2015, 7:14 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
Quote:
Originally Posted by HomerSPC View Post
Probably give the city a call.
I don't think they will tell you. You can get the legal description from the property tax page on their website and then do a title search on ISC's website.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:31 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.