Quote:
Originally Posted by officedweller
I think 1999 is too late. They wanted it operational by 1995 I think (or that could have been the Coquitlam branch).
I remember seeing a drawing of an elevated SkyTrain station at Oakridge (where the guideway shifted to the west side of Cambie to reach the mall building). I can't find it on line though.
|
1999 was when the City report was published, but it's referencing back to the early 1990s. Assuming it's correct, presumably there was no reason why an elevated transit station couldn't have been light rail, rather than SkyTrain? I think they were looking at all the options for both routes.