Forming for the 8th floor slab in well along now on the SE corner of the south tower. Most of the 7th floor walls and posts are now poured in the SW corner of the south tower as well. The NW corner of the north tower now has some of the 7th floor walls poured while the NE corner is finishing up the 7th floor slab forming.