HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Nov 16, 2022, 4:51 AM
sjk sjk is offline
Registered User
 
Join Date: Jan 2021
Location: Austin, TX
Posts: 227
Both questions are answered in the Towers article
https://austin.towers.net/[email protected]

Quote:
Originally Posted by Billy Cannon View Post
Any body have some insider information on this baby actually moving along? I’ve heard this thing starting anytime soon is a maybe at best. Don’t get me wrong, I love this build but don’t want to get swept off my feet too quick.
"The building is expected to break ground by summer 2023."

Quote:
Originally Posted by lzppjb View Post
I'm loving this building.

I wish they could have flipped the design so that wall of glass was streetside across from the park. Was it a setback or something that caused them to not be able to put the glass wall right on the street?
"Sharp readers may note that the structure’s impressively thin profile is partially due to the setbacks imposed by the Downtown Parks Overlay due to the presence of Brush Square directly south of the project site — we weren’t sure how the redevelopment of Avenue Lofts would respond to this little-known regulation, but the building’s sharp look is a pleasant side effect."
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 9:22 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.