I'm constantly amazed that current electrical best practice is to just sh*t out conduit all over the slab in a giant rats nest and then embed it forever like that.
And that structure doesn't get pissed about a bond breaker between the top and bottom of the slab thickness, especially right at the elevator core.
Quote:
Originally Posted by Harley613
That corner is at 18 right now, not 20 or 21. Somehow, I only just realized that this is only two towers, not three. Do we even have a render that compares with massing that's going up right now??

|