HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Oct 17, 2022, 2:47 AM
TMB14 TMB14 is offline
Registered User
 
Join Date: Sep 2020
Posts: 77
Quote:
Originally Posted by djforsberg View Post
This kind of shit is honestly embarrassing. How hard can it be to get line painting right?
I believe the old lines are the of the "permanent lane marking" type that are cut into the top inch or two of the asphalt and then filled. Still no excuse for not repainting lines. Though, they are just now painting Ring Road... in mid-October.

That whole 13th/Lewvan bike lane is so strange. Didn't they put a little lane on the north side of 13th something like 2 years before doing the south side?

My biggest issue with all the "cycling infrastructure" the city works on, is that there is no connection. They did the MUP along south Pasqua that goes north to Hill Ave. and then just... stops. They also used parking blocks instead of pouring an actual curb and after 1 year, it already looks atrocious. I'd rather the city just hold off on this kind of work until they actually figure out a way to make cycling infrastructure work as a transportation method and not just for a leisurely summer bike rides.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 8:06 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.