Quote:
Originally Posted by jollyburger
How quickly are they doing a floor now?
|
For the pass couple of months they've been hampered by the concrete truck driver strike, then 2 weeks ago they were shutdown for 3 days.
Before all that they were on a steady pace of a 7 or 8 day floor cycle.