Quote:
Originally Posted by acottawa
Maybe. It depends what they have to do. If you have to build a trench/viaduct through Peterborough or a greenfield bypass of the city then designing the track for a slightly faster speed probably wouldn’t cost that much more.
|
What if they have no plans to do more than new base and tracks through Peterborough?