I went onto Trinity's site (https://www.trinity-group.com/news/)

Their Q4 2021 report estimates possession in Q4 2025 (https://mailchi.mp/7825b334aeed/trinity-q1-e-blast-draft-15224980); however, if you read their Q1 2022 report, for whatever reason, it is no longer identified as one of their upcoming projects (https://mailchi.mp/e3e22ecd05ac/trinity-q1-e-blast-draft-15350660).

Another bit of information to add to the puzzle.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:34 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.