Quote:
Originally Posted by logicbomb
$4.15 billion for a tunnel that provides only 6 all-purpose lanes. Really now?
When a bridge that was superior and would have provided navigational benefits up the Fraser River would have cost 3.5 billion at most, and be completed by the mid 2020's had the NDP not cancelled the project.
|
Per Liza Yuzda on twitter "The @bcliberals plan for 10 lane bridge scrapped after @bcndp took gov. Last elxn @bcliberals said bridge would cost $8-billion."
I don't believe one particular government is better than another on delivering similar large infrastructure projects. It's the same companies doing the work in the end, with the MOTI.