Quote:
Originally Posted by Acajack
Building both the 412 and 418 in that area (especially as toll highways) always seemed to be a stretch to me, although I suppose the numbers added up.
|
The second phase of the 407 east project was completely unneeded. Phase 1 provided the connection to the 401 and serviced the urban part of Durham. That was enough.