HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jan 26, 2021, 3:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
Quote:
Originally Posted by Aylmer View Post
Or you can ensure that any shared sections have 3 (or even 4) tracks. Bordeaux has a short section which does exactly that.
So for the short section between, say, Terraces Chaudière and the start of the loop at the Portage Bridge, you avoid any bottlenecks.

Video Link
That could be possible in that stretch. It would require a major reconfiguration and possibly shut down parts of the road to cars. A major 4 track transfer station in front of Terraces would be an interesting sight. It may have to be pushed underground.

That's still 20+ years away. I'm pretty confident the STO will find a way to make it work, because capacity needs dictate that the loop will have to be used to its full potential.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:39 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.