Quote:
Originally Posted by lambe160
Its like you have no idea how anything works. Design alone can take 5-10 years. Especially in a city that has not had this magnitude of construction in 30 years. Just enjoy the process. Fun stuff is happening in Detroit.
|
I can assure you that building design does not take 5-10 years. Even a large building like this typically happens in 1-2 years, depending on how fast the developer moves.