HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Nov 12, 2020, 2:30 PM
NYbyWAYofGA's Avatar
NYbyWAYofGA NYbyWAYofGA is offline
Registered User
 
Join Date: Nov 2010
Location: NYC
Posts: 693
Quote:
Originally Posted by Street Advocate View Post
If I’m Jamestown, I’d wait until the streetcar extension breaks ground, then double whatever I had planned for phase 2 on lot B and begin construction on lot F. By the time the buildings are complete, North Ave BRT and them and the streetcar extension might be available.
Child please, then we'd be waiting until the end of this decade...
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 10:34 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.