Quote:
Originally Posted by Airboy
Would make sense to go elevated through the TUK. Code for pipeline crossing rail lines is pretty specific about the depth. If they did not take the line into account that will surly add expense. I did notice though that the TMX line in that area had some directional drilling equipment.
|
Elevated track still requires piers which would require foundation designs. I imagine it's easier to just build up an earth ramp for a Henday flyover with maybe a bridging portion for pipelines. There are also height restrictions with the 330kV overhead power line.
Quote:
Originally Posted by Airboy
There will also be a maintenance facility when the Northwest line gets built. It is supposed to be just east of 142st after the lrt crosses the train tracks.
|
You're talking about the full build-out to city limits? I know as part of the current Blatchford extension there's supposed to be a small yard constructed to the south of the Yellowhead / 75 St intersection (next to the baseball diamond), although I think it's only for storage.