Quote:
Originally Posted by WarrenC12
It's for inflation too. Reasonable to assume that's half of the 60% number.
|
Inflation 10%
Contingency 30% to 50%
Quote:
Originally Posted by M00dy
That doesn't seem even close to right to me. At-grade stations on the Skytrain system aren't that much smaller or easier.
For a recent example look at Moody Station (at-grade) vs. Burquitlam (elevated) on the Evergreen Extension.
|
Oh sorry, I meant at-grade
LRT station. Missed a word