Originally Posted by Joseph Potvin
@OtrainUser, I have seen the very extensive technical engineer's report on the culverts along that entire track. The large majority of those culverts were then and still are about 1/2 to 3/4 blocked by sediment and/or are in need of structural maintenance. When municipal officials say the track washed out due to a very heavy rain, well, uh, ya, that's true. It's also true that neither the municipality nor the 3-municipality's CCFO have ever budgeted for proactive culvert maintenance along that line. Real railway companies are required to do so.
|
For others: I haven't personally read through them but there are studies and other documents relating to the rail/trail here (mostly in french only).
|