Quote:
Originally Posted by davidcappi
The hotel at the corner is going to be a total precast structure, so expect it to go up quickly once it starts. This is never good news imo; the supplier, stubbes has only done really bad looking work in Hamilton like 220 cannon, 149 main and the panels at the Connaught.
Fingers crossed this turns out passable.
|
It would be so easy to make precast that doesn't look like shite. I can't believe there is not one company making precast right. Even just having the panels interlock rather than have a solid straight line for expansion with some similar coloured caulking to the grout.