HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #8  
Old Posted Sep 17, 2018, 7:19 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by OCCheetos View Post
The addendum to the Stage 2 Trillium Line EA has been published and includes changes to Walkley Yard, the Ellwood Diamond, Bowesville station, and the Limebank extension.

https://ottawa.ca/en/residents/transport...ng-and-environmental-assessment-ea-study
VIA is being grade separated.. that's great news. That's the biggest problem with the line's reliability.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.