Posted Sep 11, 2018, 11:10 PM
|
|
Registered User
|
|
Join Date: Sep 2017
Posts: 22
|
|
Yes, that is why I thought it was interesting that the idea is being brought up again because the amount of work would be very extensive to pull it off.
On a side note: The Midtown side of the connector is 10-20 feet higher in elevation per topographic maps.. Would be interesting to see if Georgia Tech could include this portion of Midtown in their Storm Water Master Plan.
|