HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 7, 2018, 4:19 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by cabotp View Post
Maybe we need look at the idea of adding more crossings but not have them to be has big. So instead of 8-10 lane new Massey Bridge. Maybe a 6 lane new massey bridge plus a new 6 lane bridge across from Tilbury over to richmond and then another bridge from Richmond over to boundary road. And maybe not all those bridges would be built at once but that would be the long term goal. And over time the Oak, Knight, and Queensborugh bridges would be replaced with 6 lane bridges each.
if you cant get people to replace current infrastructure, you aren't going to get them to agree to place in more, through ALR farmland. it is always good to have "backup" crossings, but it wont be done since youll never get people onside with paving over farmland when they don't want to pave over pavement and replace some pavement with more farmland...
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:40 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.